From Jeff Jirsa <jji...@gmail.com>
Subject Re: Upgrade strategy for high number of nodes
Date Sat, 30 Nov 2019 05:07:17 GMT
Scrub really shouldn’t be required here. 

If there’s ever a step that reports corruption, it’s either a very very old table where
you dropped columns previously or did something “wrong” in the past or a software bug.
The old dropped column really should be obvious in the stack trace - anything else deserves
a bug report.

It’s unfortunate that people jump to just scrubbing the unreadable data - would appreciate
an anonymized JIRA if possible. Alternatively work with your vendor to make sure they don’t
have bugs in their readers somehow. 




> On Nov 29, 2019, at 8:58 PM, Shishir Kumar <shishirroy2000@gmail.com> wrote:
> 
> 
> Some more background. We are planning (tested) binary upgrade across all nodes without
downtime. As next step running upgradesstables. As C* file format and version (from format
big, version mc to format bti, version aa (Refer https://docs.datastax.com/en/dse/6.0/dse-admin/datastax_enterprise/tools/toolsSStables/ToolsSSTableupgrade.html
- upgrade from DSE 5.1 to 6.x). Underlying changes explains why it takes too much time to
upgrade. 
> Running  upgradesstables  in parallel across RAC - This is where I am not sure on impact
of running in parallel (document recommends to run one node at time). During upgradesstables
there are scenario's where it report file corruption, hence require corrective step I.e. scrub.
Due to file corruption at times nodes goes down due to sstable corruption or result in high
CPU usage ~100%. Performing above in parallel without downtime might result in more inconsistency
across nodes. This scenario have not tested, so will need group help in case they have done
similar upgrade in past (I.e. scenario's/complexity which needs to be considered and why guideline
recommend to run upgradesstable one node at time).
> -Shishir
> 
>> On Fri, Nov 29, 2019 at 11:52 PM Josh Snyder <josh@code406.com> wrote:
>> Hello Shishir,
>> 
>> It shouldn't be necessary to take downtime to perform upgrades of a Cassandra cluster.
It sounds like the biggest issue you're facing is the upgradesstables step. upgradesstables
is not strictly necessary before a Cassandra node re-enters the cluster to serve traffic;
in my experience it is purely for optimizing the performance of the database once the software
upgrade is complete. I recommend trying out an upgrade in a test environment without using
upgradesstables, which should bring the 5 hours per node down to just a few minutes.
>> 
>> If you're running NetworkTopologyStrategy and you want to optimize further, you could
consider performing the upgrade on multiple nodes within the same rack in parallel. When correctly
configured, NetworkTopologyStrategy can protect your database from an outage of an entire
rack. So performing an upgrade on a few nodes at a time within a rack is the same as a partial
rack outage, from the database's perspective.
>> 
>> Have a nice upgrade!
>> 
>> Josh
>> 
>>> On Fri, Nov 29, 2019 at 7:22 AM Shishir Kumar <shishirroy2000@gmail.com>
wrote:
>>> Hi,
>>> 
>>> Need input on cassandra upgrade strategy for below:
>>> 1. We have Datacenter across 4 geography (multiple isolated deployments in each
DC).
>>> 2. Number of Cassandra nodes in each deployment is between 6 to 24
>>> 3. Data volume on each nodes between 150 to 400 GB
>>> 4. All production environment has DR set up
>>> 5. During upgrade we do not want downtime 
>>> 
>>> We are planning to go for stack upgrade but upgradesstables is taking approx.
5 hours per node (if data volume is approx 200 GB). 
>>> Options- 
>>> No downtime - As per recommendation (DataStax documentation) if we plan to upgrade
one node at time I.e. in sequence upgrade cycle for one environment will take weeks, so DevOps
concern.
>>> Read Only (No downtime) - Route read only load to DR system. We have resilience
built up to take care of mutation scenarios. But incase it takes more than say 3-4 hours,
there will be long catch up exercise. Maintenance cost seems too high due to unknowns 
>>> Downtime- Can upgrade all nodes in parallel as no live customers. This has direct
Customer impact, so need to convince on maintenance cost vs customer impact.
>>> Please suggest how other Organisation are solving this scenario (whom have 100+
nodes)
>>> 
>>> Regards 
>>> Shishir 
>>> 