Subject [jira] [Commented] (TEZ-1522) Scheduling can result in out of order execution and slowdown of upstream work
Date Fri, 31 Oct 2014 23:35:33 GMT

    [ https://issues.apache.org/jira/browse/TEZ-1522?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14192745#comment-14192745
] 

Bikas Saha commented on TEZ-1522:
---------------------------------

The approach overall makes sense. Did not stare at the logic in detail but something like
this needs to be well tested with different complex graph to make sure its handling all cases.
This will probably not handled the case of an aggressive minx/max downstream vertex with a
conservative min/max upstream vertex.

> Scheduling can result in out of order execution and slowdown of upstream work
> -----------------------------------------------------------------------------
>
>                 Key: TEZ-1522
>                 URL: https://issues.apache.org/jira/browse/TEZ-1522
>             Project: Apache Tez
>          Issue Type: Bug
>            Reporter: Rajesh Balamohan
>            Assignee: Rajesh Balamohan
>            Priority: Critical
>              Labels: performance
>         Attachments: TEZ-1522.1.wip.txt, TEZ-1522.2.wip.txt, TEZ-1522.am.log.gz, task_runtime.svg
>
>
> M2             M7
>     \              /
> (sg) \            /
>        R3        / (b)
>         \       /
>      (b) \     /
>           \   /
>             M5
>             |
>             R6 
> Plz refer to the attachment (task runtime SVG). In this case, M5 got scheduled much earlier
than R3 (green color in the diagram) and retained lots of containers.
> R3 got less containers to work with. 
> Attaching the output from the status monitor when the job ran;  Map_5 has taken up almost
all of cluster resource, whereas Reducer_3 got fraction of the capacity.
> Map_2: 1/1      Map_5: 0(+373)/1000     Map_7: 1/1      Reducer_3: 0/8000       Reducer_6:
0/1
> Map_2: 1/1      Map_5: 0(+374)/1000     Map_7: 1/1      Reducer_3: 0/8000       Reducer_6:
0/1
> Map_2: 1/1      Map_5: 0(+374)/1000     Map_7: 1/1      Reducer_3: 0(+1)/8000   Reducer_6:
0/1
> ....
> Map_2: 1/1      Map_5: 0(+374)/1000     Map_7: 1/1      Reducer_3: 14(+7)/8000  Reducer_6:
0/1
> Map_2: 1/1      Map_5: 0(+374)/1000     Map_7: 1/1      Reducer_3: 63(+14)/8000 Reducer_6:
0/1
> Map_2: 1/1      Map_5: 0(+374)/1000     Map_7: 1/1      Reducer_3: 159(+22)/8000    
   Reducer_6: 0/1
> Map_2: 1/1      Map_5: 0(+374)/1000     Map_7: 1/1      Reducer_3: 308(+29)/8000    
   Reducer_6: 0/1
> ...
> Creating this JIRA as a placeholder for scheduler enhancement. One possibililty could
be to
> schedule lesser number of tasks in downstream vertices, based on the information available
for the upstream vertex.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)