Hi Hyunsik,
I'm very glad that we can release the next version, soon.
Also, appreciate for the guideline of the next roadmap.

Addition to the aforementioned features, I have the two suggestions.
First is the support of CUBE operator (TAJO-259). Acutally, I started it
quite a long time ago, but it is delayed due to the lower priority than
other stability issues. But, since this operator is widely used in analytic
applications, we need to add this feature as soon as possible. So, in my
opinion, it would be good to add this feature to the next roadmap.

Second is the advanced query optimization. TAJO-266 is an issue for making
the query plan more flexible. After that, we can employ the plenty
optimization opportunities like described in TAJO-161.

How do you guys think about these issues?

Best Regards,
Jihoon


2014-04-04 14:24 GMT+09:00 Hyunsik Choi <hyunsik@apache.org>:

> Hi folks,
>
> I'm very happy to see that our community is growing! Also, It's a pleasure
> to discuss the Tajo 0.8.0 release. Recently, I've tested various features
> in various contexts, and tried to figure out if there are any critical
> problems. I think that there are only a few issues and we can release 0.8.0
> next week. If there are further issues to be solved before the 0.8.0
> release, feel free to suggest ideas.
>
> Also, I'd like to discuss our next roadmap. We are open to any suggestion
> from users, contributors, and committers. Please fire away!
>
> I'm thinking that our next stage should focus on improving the way Tajo
> runs in thousands of large cluster nodes and for a number of concurrent
> users. The key issues associated with this include the following:
>
> * High availability
> * Multi-tenancy scheduling
> * More stability
> * Improved shuffle
>
> The current work status is as follows. Min is working on Tajo's new
> scheduler (TAJO-540) based on sparrow. I'll support him. As far as I know,
> Alvin is working on TajoMaster HA (TAJO-704). Also, some guys including
> myself are investigating and solving the issues which occur in large
> clusters. These issues should be solved in order to make Tajo a complete
> enterprise-ready production.
>
> In addition, there are some SQL feature support issues. Many analytic
> problems require window functions. Also, in-subquery and scalar subquery
> should be supported. So, I'd like to schedule them with high priority. In
> my view, there will be very few SQL support issues if Tajo provides these
> features.
>
> Besides those areas, David is working on a nested schema and its related
> work (TAJO-710). I guess this will take quite a while because it requires a
> lot of hard work. So, it would be great to schedule the nested schema
> loosely. That's just my thoughts, anyhow.
>
> Aside from the discussion of our roadmap, I'd like to suggest that we need
> to release more frequently after the 0.8.0 release. So far, there has been
> a long period between each release because Tajo is undergoing heavy
> development. By 'releasing early, releasing often', we will make more
> tighter feedback loop between users and developers.
>
> I think that there are many additional many interesting issues to be
> included in our roadmap. Feel free to suggest your idea. We will arrange
> our short-term roadmap and long-term roadmap based on your suggestions.
>
> Thank you all so much for your contribution!
>
> Warm Regards,
> Hyunsik
>