syncope-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "fabio martelli (JIRA)" <j...@apache.org>
Subject [jira] [Assigned] (SYNCOPE-729) Skipped remote update during resource assignment if connector CREATE capability is not provided
Date Tue, 10 Nov 2015 17:40:11 GMT

     [ https://issues.apache.org/jira/browse/SYNCOPE-729?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

fabio martelli reassigned SYNCOPE-729:
--------------------------------------

    Assignee: Francesco Chicchiriccò  (was: fabio martelli)

> Skipped remote update during resource assignment if connector CREATE capability is not
provided
> -----------------------------------------------------------------------------------------------
>
>                 Key: SYNCOPE-729
>                 URL: https://issues.apache.org/jira/browse/SYNCOPE-729
>             Project: Syncope
>          Issue Type: Bug
>          Components: core
>    Affects Versions: 1.2.6, 2.0.0
>            Reporter: fabio martelli
>            Assignee: Francesco Chicchiriccò
>             Fix For: 1.2.7, 2.0.0
>
>
> Skipped remote update during resource assignment if connector CREATE capability is not
provided.
> Update does not occur because the beforeObj retrieving is denied: search capability check
is performed based on the original request (CREATE) instead the actual one (UPDATE).
> Suggestion: try to remove capabilitis check into the following method.
> ConnectorFacadeProxy.getObject(final PropagationMode propagationMode, final ResourceOperation
operationType, final ObjectClass objectClass, final Uid uid, final OperationOptions options)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message