phoenix-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Rajeshbabu Chintaguntla (JIRA)" <j...@apache.org>
Subject [jira] [Updated] (PHOENIX-2008) Integration tests are failing with HBase-1.1.0 because HBASE-13756
Date Sat, 23 May 2015 17:53:17 GMT

     [ https://issues.apache.org/jira/browse/PHOENIX-2008?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Rajeshbabu Chintaguntla updated PHOENIX-2008:
---------------------------------------------
    Attachment: PHOENIX-2008.patch

> Integration tests are failing with HBase-1.1.0 because HBASE-13756
> ------------------------------------------------------------------
>
>                 Key: PHOENIX-2008
>                 URL: https://issues.apache.org/jira/browse/PHOENIX-2008
>             Project: Phoenix
>          Issue Type: Bug
>            Reporter: Rajeshbabu Chintaguntla
>            Assignee: Rajeshbabu Chintaguntla
>             Fix For: 5.0.0, 4.4.0
>
>         Attachments: PHOENIX-2008.patch
>
>
> Currently the interval value the RS to report master is 3 seconds by defaults. With when
RS reporting to master once startup done getting HBASE-13756. 
> Until that fixed we can increase the interval value to some bigger number so that we
won't blocked with that.
> The configuration for the interval is hbase.regionserver.msginterval.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message