So the plan is:
1) Hive team doesn’t add any patches until step 3 below is completed.
2) ORC releases Hive 1.1.1 with delta patch(es) between ORC 1.1.0 and Hive master.
3) You commit a patch to Hive master ripping out ORC and setting their pom file to fetch ORC
1.1.1.

Is that correct?  Sounds rational.  We should act as quickly as possible to minimize the lock-out
time on the Hive team.

Alan.

> On Jun 10, 2016, at 12:36, Owen O'Malley <omalley@apache.org> wrote:
> 
> I'm glad that the 1.1.0 release is out the door. Thanks to everyone who
> tested the release to help make it better. Unfortunately, a couple of minor
> patches have gone in to the ORC in Hive code base, so my plan to rip out
> the Hive version needs to wait until we catch up. To do that, I'd like to
> roll a 1.1.1 with the catch up patches today. This time I'll send email to
> dev@hive asking them to hold off until I can get the release out the door.
> :)
> 
> Thanks,
>   Owen