From Pierre Smits <pierresm...@apache.org>
Subject Re: BOM With Multiple Levels
Date Mon, 28 Jan 2019 12:45:20 GMT
Hi James,

Have a look at [1] to get a feel of one production run being dependent
another. You have to keep in mind that doing this in such a way (through
invoking the 'Create Dependent Production Runs' on a new production run),
you may work towards undesirable efficiency results on the preceding
production runs.

Feel free to contact me directly via email or Skype to have a more
meaningful chat on the subject.


[1]
https://brewery-demo.orrtiz.com/mfg/control/ProductionRunDeclaration?productionRunId=10031

Best regards,

Pierre Smits

*Apache Trafodion <https://trafodion.apache.org>, Vice President*
*Apache Directory <https://directory.apache.org>, PMC Member*
Apache Incubator <https://incubator.apache.org>, committer
*Apache OFBiz <https://ofbiz.apache.org>, contributor (without privileges)
since 2008*
Apache Steve <https://steve.apache.org>, committer


On Mon, Jan 28, 2019 at 1:15 PM <james@productive1.com> wrote:

> Thank you Pierre.  In your example when you run a production run for
> HissVat-0002F33mE does it also create a production run for
> HissVat-0002B7?
>
>
>
> -------- Original Message --------
> Subject: Re: BOM With Multiple Levels
> From: Pierre Smits <pierresmits@apache.org>
> Date: Mon, January 28, 2019 12:56 am
> To: user@ofbiz.apache.org
>
> HI James,
>
> Of course, OFBiz supports multi-level BoM out-of-the-box. You can
> simulate
> this in my demo site for breweries (see [1]) by setting the quantity to
> e.g. 1000 for the product (a bottle of beer) and the explosion type to
> 'explosion'. This will show the quantities (and cost) for not only the
> 1000
> end products, but also the underlying elements: 1000 bottles of beer
> without a label and the beer. In effect showing a BoM of 3 levels deep.
>
>
> [1]
>
> https://brewery-demo.orrtiz.com/mfg/control/BomSimulation?productId=HissVat-0002F33mE
> (use userId:* brewmeister*, and password: *orrtiz* )
>
> Best regards,
>
> Pierre Smits
>
> *Apache Trafodion <https://trafodion.apache.org>, Vice President*
> *Apache Directory <https://directory.apache.org>, PMC Member*
> Apache Incubator <https://incubator.apache.org>, committer
> *Apache OFBiz <https://ofbiz.apache.org>, contributor (without
> privileges)
> since 2008*
> Apache Steve <https://steve.apache.org>, committer
>
>
> On Sun, Jan 27, 2019 at 10:06 PM <james@productive1.com> wrote:
>
> > All - Does Ofbiz handle Multi-Level BOM in one production process?
> >
> > For Example for Product ABC the components are:
> >
> > Mix123
> > CAP218
> > Bottle127
> >
> > However MIX123 also has components:
> > DP2897 & M2781
> >
> > So the question is can I make Mix 123 as the 1st part of the production
> > process in Making Product ABC?
> >
> > Thanks,
> >
> > James
> >
>