Subject Re: Manufacturing Washers from Pipes
Date Wed, 16 Oct 2013 10:23:29 GMT
Hi Rupert,

Have you tried setting up the BoM between Washer (Produced after passing through required
operations) and Pipe (as a BoM component or raw material) in ratio of 1 : 0.001. Once you
associate the Washer with proper routing and create production run then you should be able
to produce 1000 units of washers and stock them in inventory by consuming 1 unit of Pipe (assuming
that scrap factor is 0%).  I have not tested but MRP would also honor this BoM while generating
the Procurement or Production requirement for Pipes based on demand for Washers from downstream
operations or safety stock requirements  or sales orders or forecast in the supply chain.

Thanks,
Swapnil



On 05-Sep-2013, at 2:18 AM, Rupert Howell wrote:

> HI All,
> 
> I'm looking for a way to use the MRP to create a load of washers from a
> length of steel pipe which is ordered in from a supplier. A piece of pipe
> is cut into 1000 pieces so one productId is chopped up and 1000 items of a
> different productId needs to be put into stock and a number of these
> washers used further down the production chain.
> 
> Assembling the length of pipe from 1000 washers is straight forward enough
> - but I need to effectively disassemble the pipe and I cannot see if this
> functionality has been implemented. Can anyone point me in the right
> direction?
> 
> Many Thanks,
> 
> -- 
> Rupert Howell
> 
> Provolve Ltd
> Front Office, Deale House, 16 Lavant Street, Petersfield, GU32 3EW, UK
> 
> t: 01730 267868 / m: 079 0968 5308
> e:  ruperthowell@provolve.com
> w: http://www.provolve.com


Mime
View raw message