jackrabbit-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Jukka Zitting (JIRA)" <j...@apache.org>
Subject [jira] Updated: (JCR-2048) Workspace is shut down while creating initial index
Date Tue, 21 Apr 2009 10:46:47 GMT

     [ https://issues.apache.org/jira/browse/JCR-2048?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Jukka Zitting updated JCR-2048:
-------------------------------

    Fix Version/s:     (was: 1.6.0)
                   1.5.5

Merged to the 1.5 branch in revision 767106.

> Workspace is shut down while creating initial index
> ---------------------------------------------------
>
>                 Key: JCR-2048
>                 URL: https://issues.apache.org/jira/browse/JCR-2048
>             Project: Jackrabbit Content Repository
>          Issue Type: Bug
>          Components: jackrabbit-core
>    Affects Versions: 1.4, 1.5.0
>            Reporter: Marcel Reutegger
>            Priority: Minor
>             Fix For: 1.5.5
>
>         Attachments: JCR-2048.patch
>
>
> This only happens when a maxIdleTime is configured for the workspaces in the repository.xml
and the workspace to index is not the default workspace.
> The idle check considers a workspace as idle when there only a system session is open
and the configured idle time elapsed. This is also the case when the workspace is initializing.
> The repository should either check if a workspace is still initializing or we need to
move the search manager initialization into the WorkspaceInfo.doInitialize() method.

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.


Mime
View raw message