From "Chris Thistlethwaite (JIRA)" <j...@apache.org>
Subject [jira] [Assigned] (INFRA-17318) Would like to be able to assign Story Points to Geode JIRA tickets
Date Wed, 28 Nov 2018 18:11:00 GMT

     [ https://issues.apache.org/jira/browse/INFRA-17318?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Chris Thistlethwaite reassigned INFRA-17318:
--------------------------------------------

    Assignee: Chris Thistlethwaite

> Would like to be able to assign Story Points to Geode JIRA tickets
> ------------------------------------------------------------------
>
>                 Key: INFRA-17318
>                 URL: https://issues.apache.org/jira/browse/INFRA-17318
>             Project: Infrastructure
>          Issue Type: Improvement
>          Components: JIRA
>            Reporter: Dan Smith
>            Assignee: Chris Thistlethwaite
>            Priority: Minor
>
> We're trying to use a JIRA sprint planning board for some of the work we are doing on
Geode. We'd like to be able to estimate the size of our tasks.
> In the board configuration, we set the Estimation Statistic to be "Story Points." 
> However, the "Story Points" field doesn't appear to be something that we we can see or
modify in the Geode JIRA. Can we add this field to the list of fields we can modify on our
JIRA?
> Thanks,
> -Dan
> This is the board we created:
> https://issues.apache.org/jira/secure/RapidView.jspa?rapidView=295&tab=estimation



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)