incubator-cvs mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From Apache Wiki <wikidi...@apache.org>
Subject [Incubator Wiki] Update of "April2010" by LeifHedstrom
Date Wed, 14 Apr 2010 23:58:42 GMT
Dear Wiki user,

You have subscribed to a wiki page or wiki category on "Incubator Wiki" for change notification.

The "April2010" page has been changed by LeifHedstrom.
http://wiki.apache.org/incubator/April2010?action=diff&rev1=41&rev2=42

--------------------------------------------------

  
  JSPWiki is a JSP-based wiki program.
  
+ Quite a few bugs were fixed in the JSP tier. Slimbox was upgraded, various media formats
are now supported so you can view youtube or facebook videos, other wikipages, or even external
web-pages. Also support was added for multi-file uploads. We also added an experimental wysiwyg
editor based on mootools.
  
- Quite a few bugs were fixed in the JSP tier.
- Slimbox was upgraded, various media formats are now
- supported so you can view youtube or facebook videos, other
- wikipages, or even external web-pages.
- Also support was added for multi-file uploads.
- We also added an experimental wysiwyg editor based on mootools.
- 
- ReferenceManager was rewritten to use JCR UUIDs to keep references
+ ReferenceManager was rewritten to use JCR UUIDs to keep references between pages.
- between pages.
  
- A couple of bugs were fixed and, and the unit test compliance has climbed 
+ A couple of bugs were fixed and, and the unit test compliance has climbed  from 96.8  to
99.3 %.
- from 96.8  to 99.3 %.  
  
+ Of the 28 items (1 was recently added) on the graduation checklist,  19 are complete, so
in that area there has been not much progress,  with the exception of fixing junit tests..
 All open items are documentation and ASF process and infrastructure related. There still
is no 3.0.0-incubating-alpha1 release.
- Of the 28 items (1 was recently added) on the graduation checklist, 
- 19 are complete, so in that area there has been not much progress, 
- with the exception of fixing junit tests.. 
- All open items are documentation and ASF process and infrastructure related.
- There still is no 3.0.0-incubating-alpha1 release.
  
  It looks like things have slowed down the last few weeks for an unknown reason.
  
+ The developer list currently has 88 members, an increase from 82; and the user list has
193 members, an increase from 191.
- The developer list currently has 88 members, an increase from 82; and the
- user list has 193 members, an increase from 191. 
  
  Signed off by mentor: Craig L Russell
  
@@ -264, +251 @@

  = Tashi =
  Tashi has been incubating since September 2008.
  
+ The Tashi project aims to build a software infrastructure for cloud computing  on massive
internet-scale datasets (what we call Big Data). The idea is to  build a cluster management
system that enables the Big Data that are stored in  a cluster/data center to be accessed,
shared, manipulated, and computed on by  remote users in a convenient, efficient, and safe
manner.
- The Tashi project aims to build a software infrastructure for cloud computing 
- on massive internet-scale datasets (what we call Big Data). The idea is to 
- build a cluster management system that enables the Big Data that are stored in 
- a cluster/data center to be accessed, shared, manipulated, and computed on by 
- remote users in a convenient, efficient, and safe manner.
  
+ Development activities have included fixes to conform to new python programming standards,
and a module for Zoni to assign ports on HP blade server switches.
- Development activities have included fixes to conform to new python
- programming standards, and a module for Zoni to assign ports on
- HP blade server switches.
  
+ The project is still working toward building a larger user and development  community. 
Michael Ryan, an active committer on the project, has taken a new  job and is unable to actively
contribute to the project any longer. Richard Gass, who is running a Tashi production environment,
has been added as a committer. Richard introduced the Zoni physical hardware management layer
to Tashi earlier.
- The project is still working toward building a larger user and development 
- community.  Michael Ryan, an active committer on the project, has taken a new 
- job and is unable to actively contribute to the project any longer. Richard
- Gass, who is running a Tashi production environment, has been added as a
- committer. Richard introduced the Zoni physical hardware management layer
- to Tashi earlier.
  
  Items to be resolved before graduation:
+ 
-         * Prepare and review a release candidate
+  * Prepare and review a release candidate
-         * Develop community diversity (currently Intel and CMU committers)
+  * Develop community diversity (currently Intel and CMU committers)
  
  Signed off by mentor: Craig L Russell
  
@@ -305, +282 @@

   * 2010-02-02 Automatic sync from SVN dist repo to dist servers setup.
   * 2010-01-18 George Paul joins the Traffic Server PPMC.
  
- The graduation process is completed, and we've passed the votes in both the PPMC and the
IPMC. A resolution will be submitted to the board for the April board meeting.
+ The graduation process is completed, and we've passed the votes in both the PPMC and the
IPMC. A resolution  proposal has been submitted to the board for the next board meeting.
  
  Signed off by mentor:
  

---------------------------------------------------------------------
To unsubscribe, e-mail: cvs-unsubscribe@incubator.apache.org
For additional commands, e-mail: cvs-help@incubator.apache.org


Mime
View raw message