On 10/31/2012 05:30 PM, Steven Bethard wrote:
> If we start having enough developers that freezing the trunk for a day or two is really
slowing people down, we can always switch to a more complicated scheme later.

Minimum freeze period will be longer, since you need at least 72 hours 
to get the vote through, some time to prepare
the release candidate, some time to test it, etc. That can easily sum up 
to one week or two.

Over at UIMA we always freeze and then everybody helps with testing and 
reviewing,
new work which needs to go into trunk can also be worked on in parallel 
and be pushed into trunk
after the release. I personally like this model because it encourages 
everyone to help out with the
release work.