incubator-callback-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From Brian LeRoux...@brian.io>
Subject Re: [DISCUSS] graduation date
Date Thu, 04 Oct 2012 10:50:10 GMT
We do not have a formal charter. I started something in the wiki [1]
drawing on some of the content from our proposal [2].

[1] http://wiki.apache.org/cordova/Draft%20Charter
[2] http://wiki.apache.org/incubator/CallbackProposal

On Wed, Oct 3, 2012 at 8:42 PM, Steven Gill <stevengill97@gmail.com> wrote:
> I want to bump this thread up and get the graduation process started. We
> have released 2.1 as the first official release for Apache Cordova.
>
> Looking at the link Jukka posted (
> http://incubator.apache.org/guides/graduation.html#process)
>
> There are a few steps left till graduation:
>
>
>    - a charter for your project
>    - a positive community graduation
> VOTE<http://www.apache.org/foundation/voting.html>
>    - a positive IPMC recommendation
> VOTE<http://www.apache.org/foundation/voting.html>
>    - the acceptance of the
> resolution<http://incubator.apache.org/guides/graduation.html#tlp-resolution>
> by
>    the Board
>
> I am not sure if we have a charter. Anyone have any details on this?
>
> We can start a vote thread, but I am wondering if we need to have the
> charter before we start it.
>
> -Steve
>
> On Sat, Sep 8, 2012 at 8:12 AM, Michael Brooks <mikeywbrooks@gmail.com>wrote:
>
>> +1 for 2.1
>>
>> On 2012-09-07, at 12:14 PM, Brian LeRoux <b@brian.io> wrote:
>>
>> > Well, want to point out if we ship 2.1 src (w/ official process and
>> > vote) the only additional step is another vote thread specifying
>> > whether we feel we're ready for graduating. (Which is why I'm thinking
>> > doing it sooner isn't a big deal.)
>> >
>> >
>> > On Fri, Sep 7, 2012 at 11:01 AM, Filip Maj <fil@adobe.com> wrote:
>> >> 2.1 is probably cutting it too close.
>> >>
>> >> Around the time of 2.2 more realistic?
>> >>
>> >> On 9/7/12 10:34 AM, "Brian LeRoux" <b@brian.io> wrote:
>> >>
>> >>> Hi guys, we are close to being ready to engage the graduation process
>> >>> and become a top level project. [1] Ross suggested we set a date and
I
>> >>> agree. The next board report isn't due until November but that doesn't
>> >>> mean we cant' do thing sooner. My preference would be mid-september
>> >>> (after we ship 2.1) but maybe thats too soon.
>> >>>
>> >>> Thoughts?
>> >>>
>> >>> http://incubator.apache.org/guides/graduation.html#toplevel
>> >>
>>

Mime
View raw message