hive-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hive QA (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (HIVE-22068) Add more logging to notification cleaner and replication to track events
Date Thu, 01 Aug 2019 18:00:00 GMT

    [ https://issues.apache.org/jira/browse/HIVE-22068?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16898240#comment-16898240
] 

Hive QA commented on HIVE-22068:
--------------------------------



Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12976451/HIVE-22068.01.patch

{color:red}ERROR:{color} -1 due to no test(s) being added or modified.

{color:red}ERROR:{color} -1 due to 2 failed/errored test(s), 16686 tests executed
*Failed tests:*
{noformat}
TestDataSourceProviderFactory - did not produce a TEST-*.xml file (likely timed out) (batchId=232)
TestObjectStore - did not produce a TEST-*.xml file (likely timed out) (batchId=232)
{noformat}

Test results: https://builds.apache.org/job/PreCommit-HIVE-Build/18232/testReport
Console output: https://builds.apache.org/job/PreCommit-HIVE-Build/18232/console
Test logs: http://104.198.109.242/logs/PreCommit-HIVE-Build-18232/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.TestCheckPhase
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.YetusPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 2 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12976451 - PreCommit-HIVE-Build

> Add more logging to notification cleaner and replication to track events
> ------------------------------------------------------------------------
>
>                 Key: HIVE-22068
>                 URL: https://issues.apache.org/jira/browse/HIVE-22068
>             Project: Hive
>          Issue Type: Improvement
>            Reporter: Ashutosh Bapat
>            Assignee: Ashutosh Bapat
>            Priority: Major
>              Labels: pull-request-available
>         Attachments: HIVE-22068.01.patch
>
>          Time Spent: 10m
>  Remaining Estimate: 0h
>
> * Add more logging to DB notification listener cleaner thread
>  ** The time when it considered cleaning, the interval and time before which events were
cleared, the min and max id at that time
>  ** how many events were cleared
>  ** min and max id after the cleaning.
>  * In REPL::START document the starting event, end event if specified and the maximum
number of events, if specified.



--
This message was sent by Atlassian JIRA
(v7.6.14#76016)

Mime
View raw message