hive-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hive QA (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (HIVE-8727) Dag summary has incorrect row counts and duration per vertex
Date Tue, 04 Nov 2014 21:52:34 GMT

    [ https://issues.apache.org/jira/browse/HIVE-8727?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14196902#comment-14196902
] 

Hive QA commented on HIVE-8727:
-------------------------------



{color:red}Overall{color}: -1 at least one tests failed

Here are the results of testing the latest attachment:
https://issues.apache.org/jira/secure/attachment/12679285/HIVE-8727.1.patch

{color:red}ERROR:{color} -1 due to 2 failed/errored test(s), 6671 tests executed
*Failed tests:*
{noformat}
org.apache.hadoop.hive.cli.TestMiniTezCliDriver.testCliDriver_optimize_nullscan
org.apache.hive.hcatalog.streaming.TestStreaming.testEndpointConnection
{noformat}

Test results: http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/1632/testReport
Console output: http://ec2-174-129-184-35.compute-1.amazonaws.com/jenkins/job/PreCommit-HIVE-TRUNK-Build/1632/console
Test logs: http://ec2-174-129-184-35.compute-1.amazonaws.com/logs/PreCommit-HIVE-TRUNK-Build-1632/

Messages:
{noformat}
Executing org.apache.hive.ptest.execution.PrepPhase
Executing org.apache.hive.ptest.execution.ExecutionPhase
Executing org.apache.hive.ptest.execution.ReportingPhase
Tests exited with: TestsFailedException: 2 tests failed
{noformat}

This message is automatically generated.

ATTACHMENT ID: 12679285 - PreCommit-HIVE-TRUNK-Build

> Dag summary has incorrect row counts and duration per vertex
> ------------------------------------------------------------
>
>                 Key: HIVE-8727
>                 URL: https://issues.apache.org/jira/browse/HIVE-8727
>             Project: Hive
>          Issue Type: Bug
>    Affects Versions: 0.14.0
>            Reporter: Mostafa Mokhtar
>            Assignee: Prasanth J
>             Fix For: 0.14.0
>
>         Attachments: HIVE-8727.1.patch
>
>
> During the code review for HIVE-8495 some code was reworked which broke some of INPUT/OUTPUT
counters and duration.
> Patch attached which fixes that.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message