Return-Path: X-Original-To: apmail-helix-commits-archive@minotaur.apache.org Delivered-To: apmail-helix-commits-archive@minotaur.apache.org Received: from mail.apache.org (hermes.apache.org [140.211.11.3]) by minotaur.apache.org (Postfix) with SMTP id 8A0D51045C for ; Tue, 17 Mar 2015 21:41:00 +0000 (UTC) Received: (qmail 85839 invoked by uid 500); 17 Mar 2015 21:41:00 -0000 Delivered-To: apmail-helix-commits-archive@helix.apache.org Received: (qmail 85808 invoked by uid 500); 17 Mar 2015 21:41:00 -0000 Mailing-List: contact commits-help@helix.apache.org; run by ezmlm Precedence: bulk List-Help: List-Unsubscribe: List-Post: List-Id: Reply-To: dev@helix.apache.org Delivered-To: mailing list commits@helix.apache.org Received: (qmail 85799 invoked by uid 99); 17 Mar 2015 21:41:00 -0000 Received: from athena.apache.org (HELO athena.apache.org) (140.211.11.136) by apache.org (qpsmtpd/0.29) with ESMTP; Tue, 17 Mar 2015 21:41:00 +0000 X-ASF-Spam-Status: No, hits=-2000.0 required=5.0 tests=ALL_TRUSTED,T_RP_MATCHES_RCVD X-Spam-Check-By: apache.org Received: from [140.211.11.3] (HELO mail.apache.org) (140.211.11.3) by apache.org (qpsmtpd/0.29) with SMTP; Tue, 17 Mar 2015 21:40:59 +0000 Received: (qmail 84305 invoked by uid 99); 17 Mar 2015 21:40:39 -0000 Received: from arcas.apache.org (HELO arcas.apache.org) (140.211.11.28) by apache.org (qpsmtpd/0.29) with ESMTP; Tue, 17 Mar 2015 21:40:39 +0000 Date: Tue, 17 Mar 2015 21:40:39 +0000 (UTC) From: "Zhen Zhang (JIRA)" To: commits@helix.incubator.apache.org Message-ID: In-Reply-To: References: Subject: [jira] [Closed] (HELIX-519) Add integration tests to ensure that "kill-switch" for Helix tasks work as expected MIME-Version: 1.0 Content-Type: text/plain; charset=utf-8 Content-Transfer-Encoding: 7bit X-JIRA-FingerPrint: 30527f35849b9dde25b450d4833f0394 X-Virus-Checked: Checked by ClamAV on apache.org [ https://issues.apache.org/jira/browse/HELIX-519?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] Zhen Zhang closed HELIX-519. ---------------------------- Resolution: Fixed > Add integration tests to ensure that "kill-switch" for Helix tasks work as expected > ----------------------------------------------------------------------------------- > > Key: HELIX-519 > URL: https://issues.apache.org/jira/browse/HELIX-519 > Project: Apache Helix > Issue Type: Bug > Reporter: Zhen Zhang > Assignee: Zhen Zhang > Fix For: 0.6.5 > > Original Estimate: 72h > Remaining Estimate: 72h > > 1. Integration test is written to verify that any currently running helix task just stops after "pause" command is issued(this will be done through a separate tool). Since the job at head of queue is paused, no other job in the queue should be scheduled. > 2. Integration test is written to verify that no new helix task gets scheduled until "resume/start" command is issued again > 3. Integration test is written to verify that if we cancel the job at head of queue, other jobs in the queue get scheduled as per normal queue semantics. -- This message was sent by Atlassian JIRA (v6.3.4#6332)