hbase-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "stack (JIRA)" <j...@apache.org>
Subject [jira] [Comment Edited] (HBASE-19165) TODO Handle stuck in transition: rit=OPENING, location=ve0538....
Date Tue, 07 Nov 2017 05:50:00 GMT

    [ https://issues.apache.org/jira/browse/HBASE-19165?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=16241250#comment-16241250
] 

stack edited comment on HBASE-19165 at 11/7/17 5:49 AM:
--------------------------------------------------------

Test failure is a good one. I filed HBASE-19193 to address it later. The test failure is part
of a larger issue of what to do when empty state (Can have empty state as part of migration
but HBASE-19193 shows we can have an empty state if Master crashes in midst of a Table delete......Good
one).


was (Author: stack):
Test failure is a good one. I filed HBASE-19165 to address it later. The test failure is part
of a larger issue of what to do when empty state (Can have empty state as part of migration
but HBASE-19193 shows we can have an empty state if Master crashes in midst of a Table delete......Good
one).

> TODO Handle stuck in transition: rit=OPENING, location=ve0538....
> -----------------------------------------------------------------
>
>                 Key: HBASE-19165
>                 URL: https://issues.apache.org/jira/browse/HBASE-19165
>             Project: HBase
>          Issue Type: Bug
>          Components: migration
>            Reporter: stack
>            Assignee: stack
>            Priority: Critical
>             Fix For: 2.0.0-beta-1
>
>         Attachments: HBASE-19165.master.001.patch, HBASE-19165.master.002.patch
>
>
> A few of us trying migration from hbase1 to hbase2 have run into various assignment issues.
In my case, I see that Master coming online, reading hbase:meta, finding an issue in OPENING
state and then just not assigning. My thought is that its expecting a callback to come in.
Eventually log is fills with this sort of stuff:
> 2017-11-02 15:02:54,237 WARN  [ProcExecTimeout] assignment.AssignmentManager: TODO Handle
stuck in transition: rit=OPENING, location=ve0528.halxg.cloudera.com,16020,1509657692581,
table=IntegrationTestBigLinkedList, region=919cc6636ffbed17f628f335d3a58726
> Let me get a cleaner run. This current log is polluted by a few restarts.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Mime
View raw message