hbase-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hadoop QA (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (HBASE-13895) DATALOSS: Double-assignment ITBLL'ing
Date Sun, 14 Jun 2015 09:12:01 GMT

    [ https://issues.apache.org/jira/browse/HBASE-13895?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14584999#comment-14584999
] 

Hadoop QA commented on HBASE-13895:
-----------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12739473/hbase-13895_v1-branch-1.1.patch
  against branch-1.1 branch at commit 682b8ab8a542a903e5807053282693e3a96bad2d.
  ATTACHMENT ID: 12739473

    {color:green}+1 @author{color}.  The patch does not contain any @author tags.

    {color:green}+1 tests included{color}.  The patch appears to include 6 new or modified
tests.

    {color:green}+1 hadoop versions{color}. The patch compiles with all supported hadoop versions
(2.4.1 2.5.2 2.6.0)

    {color:green}+1 javac{color}.  The applied patch does not increase the total number of
javac compiler warnings.

    {color:green}+1 protoc{color}.  The applied patch does not increase the total number of
protoc compiler warnings.

    {color:green}+1 javadoc{color}.  The javadoc tool did not generate any warning messages.

    {color:green}+1 checkstyle{color}.  The applied patch does not increase the total number
of checkstyle errors

    {color:green}+1 findbugs{color}.  The patch does not introduce any  new Findbugs (version
2.0.3) warnings.

    {color:green}+1 release audit{color}.  The applied patch does not increase the total number
of release audit warnings.

    {color:green}+1 lineLengths{color}.  The patch does not introduce lines longer than 100

  {color:green}+1 site{color}.  The mvn site goal succeeds with this patch.

     {color:red}-1 core tests{color}.  The patch failed these unit tests:
                       org.apache.hadoop.hbase.master.TestAssignmentManagerOnCluster
                  org.apache.hadoop.hbase.master.TestZKLessAMOnCluster

Test results: https://builds.apache.org/job/PreCommit-HBASE-Build/14402//testReport/
Release Findbugs (version 2.0.3) 	warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/14402//artifact/patchprocess/newFindbugsWarnings.html
Checkstyle Errors: https://builds.apache.org/job/PreCommit-HBASE-Build/14402//artifact/patchprocess/checkstyle-aggregate.html

  Console output: https://builds.apache.org/job/PreCommit-HBASE-Build/14402//console

This message is automatically generated.

> DATALOSS: Double-assignment ITBLL'ing
> -------------------------------------
>
>                 Key: HBASE-13895
>                 URL: https://issues.apache.org/jira/browse/HBASE-13895
>             Project: HBase
>          Issue Type: Bug
>    Affects Versions: 1.2.0
>            Reporter: stack
>            Assignee: stack
>            Priority: Critical
>             Fix For: 1.2.0
>
>         Attachments: hbase-13895_v1-branch-1.1.patch
>
>
> Opening a place holder till finish analysis.
> I have dataloss running ITBLL at 3B (testing HBASE-13877). Most obvious culprit is the
double-assignment that I can see.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message