Return-Path: X-Original-To: apmail-hbase-issues-archive@www.apache.org Delivered-To: apmail-hbase-issues-archive@www.apache.org Received: from mail.apache.org (hermes.apache.org [140.211.11.3]) by minotaur.apache.org (Postfix) with SMTP id 4218B17C5F for ; Mon, 11 May 2015 17:46:00 +0000 (UTC) Received: (qmail 81680 invoked by uid 500); 11 May 2015 17:46:00 -0000 Delivered-To: apmail-hbase-issues-archive@hbase.apache.org Received: (qmail 81628 invoked by uid 500); 11 May 2015 17:46:00 -0000 Mailing-List: contact issues-help@hbase.apache.org; run by ezmlm Precedence: bulk List-Help: List-Unsubscribe: List-Post: List-Id: Delivered-To: mailing list issues@hbase.apache.org Received: (qmail 81615 invoked by uid 99); 11 May 2015 17:46:00 -0000 Received: from arcas.apache.org (HELO arcas.apache.org) (140.211.11.28) by apache.org (qpsmtpd/0.29) with ESMTP; Mon, 11 May 2015 17:46:00 +0000 Date: Mon, 11 May 2015 17:45:59 +0000 (UTC) From: "Hadoop QA (JIRA)" To: issues@hbase.apache.org Message-ID: In-Reply-To: References: Subject: [jira] [Commented] (HBASE-13659) Improve test run time for TestMetaWithReplicas class MIME-Version: 1.0 Content-Type: text/plain; charset=utf-8 Content-Transfer-Encoding: 7bit X-JIRA-FingerPrint: 30527f35849b9dde25b450d4833f0394 [ https://issues.apache.org/jira/browse/HBASE-13659?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14538256#comment-14538256 ] Hadoop QA commented on HBASE-13659: ----------------------------------- {color:green}+1 overall{color}. Here are the results of testing the latest attachment http://issues.apache.org/jira/secure/attachment/12731937/HBASE-13659.patch against master branch at commit 9aeafe30b7d932e562f803fd071812cd27aebaf8. ATTACHMENT ID: 12731937 {color:green}+1 @author{color}. The patch does not contain any @author tags. {color:green}+1 tests included{color}. The patch appears to include 4 new or modified tests. {color:green}+1 hadoop versions{color}. The patch compiles with all supported hadoop versions (2.4.1 2.5.2 2.6.0) {color:green}+1 javac{color}. The applied patch does not increase the total number of javac compiler warnings. {color:green}+1 protoc{color}. The applied patch does not increase the total number of protoc compiler warnings. {color:green}+1 javadoc{color}. The javadoc tool did not generate any warning messages. {color:green}+1 checkstyle{color}. The applied patch does not increase the total number of checkstyle errors {color:green}+1 findbugs{color}. The patch does not introduce any new Findbugs (version 2.0.3) warnings. {color:green}+1 release audit{color}. The applied patch does not increase the total number of release audit warnings. {color:green}+1 lineLengths{color}. The patch does not introduce lines longer than 100 {color:green}+1 site{color}. The mvn site goal succeeds with this patch. {color:green}+1 core tests{color}. The patch passed unit tests in . Test results: https://builds.apache.org/job/PreCommit-HBASE-Build/14008//testReport/ Release Findbugs (version 2.0.3) warnings: https://builds.apache.org/job/PreCommit-HBASE-Build/14008//artifact/patchprocess/newFindbugsWarnings.html Checkstyle Errors: https://builds.apache.org/job/PreCommit-HBASE-Build/14008//artifact/patchprocess/checkstyle-aggregate.html Console output: https://builds.apache.org/job/PreCommit-HBASE-Build/14008//console This message is automatically generated. > Improve test run time for TestMetaWithReplicas class > ---------------------------------------------------- > > Key: HBASE-13659 > URL: https://issues.apache.org/jira/browse/HBASE-13659 > Project: HBase > Issue Type: Sub-task > Components: test > Reporter: Ashish Singhi > Assignee: Ashish Singhi > Attachments: HBASE-13659.patch > > > In TestMetaWithReplicas, start and shutdown of mini cluster is done at start and end of every test in that class respectively, which makes the test class to take more time to complete. Instead we can start and stop the mini cluster only once per the class. -- This message was sent by Atlassian JIRA (v6.3.4#6332)