hbase-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hudson (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (HBASE-12549) Fix TestAssignmentManagerOnCluster#testAssignRacingWithSSH() flaky test
Date Fri, 21 Nov 2014 01:56:34 GMT

    [ https://issues.apache.org/jira/browse/HBASE-12549?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14220393#comment-14220393
] 

Hudson commented on HBASE-12549:
--------------------------------

FAILURE: Integrated in HBase-1.0 #487 (See [https://builds.apache.org/job/HBase-1.0/487/])
HBASE-12549 Fix TestAssignmentManagerOnCluster#testAssignRacingWithSSH() flaky test (enis:
rev 49422a9ec48c680e7cd5836336a87090aa91d98f)
* hbase-server/src/test/java/org/apache/hadoop/hbase/master/TestAssignmentManagerOnCluster.java


> Fix TestAssignmentManagerOnCluster#testAssignRacingWithSSH() flaky test
> -----------------------------------------------------------------------
>
>                 Key: HBASE-12549
>                 URL: https://issues.apache.org/jira/browse/HBASE-12549
>             Project: HBase
>          Issue Type: Test
>            Reporter: Enis Soztutar
>            Assignee: Enis Soztutar
>             Fix For: 2.0.0, 0.98.9, 0.99.2
>
>         Attachments: hbase-12549_v1.patch
>
>
> TestAssignmentManagerOnCluster#testAssignRacingWithSSH() runs on average 40 sec, with
60 sec timeout. This causes flakiness. 
> The fix is easy. One of the earlier tests increases the hbase.assignment.maximum.attempts
from 3 to 10. Then testAssignRacingWithSSH() is ran with 10 attempts causing slowness. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message