hbase-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Jingcheng Du (JIRA)" <j...@apache.org>
Subject [jira] [Updated] (HBASE-12080) Shorten the run time of integration test by default when using mvn failsafe:integration-test
Date Wed, 24 Sep 2014 09:10:34 GMT

     [ https://issues.apache.org/jira/browse/HBASE-12080?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Jingcheng Du updated HBASE-12080:
---------------------------------
    Attachment: HBASE-12080.diff

Shorten the default run time to 2 minutes, and lower the inserted data size.

> Shorten the run time of integration test by default when using mvn failsafe:integration-test
> --------------------------------------------------------------------------------------------
>
>                 Key: HBASE-12080
>                 URL: https://issues.apache.org/jira/browse/HBASE-12080
>             Project: HBase
>          Issue Type: Sub-task
>          Components: test
>    Affects Versions: 2.0.0
>            Reporter: Jingcheng Du
>            Assignee: Jingcheng Du
>             Fix For: hbase-11339
>
>         Attachments: HBASE-12080.diff
>
>
> By default, using "mvn failsafe:integration-test" to execute the integration test with
MOB will run more than 10 minutes. In this JIRA, we'll shorten this run time by default.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message