hbase-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Sergey Shelukhin (JIRA)" <j...@apache.org>
Subject [jira] [Assigned] (HBASE-5258) Move coprocessors set out of RegionLoad
Date Thu, 06 Dec 2012 19:17:09 GMT

     [ https://issues.apache.org/jira/browse/HBASE-5258?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Sergey Shelukhin reassigned HBASE-5258:
---------------------------------------

    Assignee: Sergey Shelukhin
    
> Move coprocessors set out of RegionLoad
> ---------------------------------------
>
>                 Key: HBASE-5258
>                 URL: https://issues.apache.org/jira/browse/HBASE-5258
>             Project: HBase
>          Issue Type: Task
>            Reporter: Ted Yu
>            Assignee: Sergey Shelukhin
>            Priority: Critical
>         Attachments: HBASE-5258-v0.patch
>
>
> When I worked on HBASE-5256, I revisited the code related to Ser/De of coprocessors set
in RegionLoad.
> I think the rationale for embedding coprocessors set is for maximum flexibility where
each region can load different coprocessors.
> This flexibility is causing extra cost in the region server to Master communication and
increasing the footprint of Master heap.
> Would HServerLoad be a better place for this set ?
> If required, region server should calculate disparity of loaded coprocessors among regions
and send report through HServerLoad

--
This message is automatically generated by JIRA.
If you think it was sent incorrectly, please contact your JIRA administrators
For more information on JIRA, see: http://www.atlassian.com/software/jira

Mime
View raw message