hbase-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Sean Busbey (JIRA)" <j...@apache.org>
Subject [jira] [Created] (HBASE-18639) nightly jobs that need to do jdk7 + jdk8 need more than 6 hours
Date Sun, 20 Aug 2017 20:05:00 GMT
Sean Busbey created HBASE-18639:
-----------------------------------

             Summary: nightly jobs that need to do jdk7 + jdk8 need more than 6 hours
                 Key: HBASE-18639
                 URL: https://issues.apache.org/jira/browse/HBASE-18639
             Project: HBase
          Issue Type: Task
          Components: test
            Reporter: Sean Busbey
             Fix For: 1.3.2, 1.4.1, 1.5.0, 1.2.7


looks like the branches that need to do 2 jdks will need more than 6 hours, at least until
we can parallelize things.

e.g. 

* [branch-1.2|https://builds.apache.org/view/H-L/view/HBase/job/HBase%20Nightly/job/branch-1.2/buildTimeTrend]
* [branch-1.3|https://builds.apache.org/view/H-L/view/HBase/job/HBase%20Nightly/job/branch-1.3/buildTimeTrend]

branch-1.4 and branch-1 are failing in jdk7 checks, so they don't go that long yet, but once
we get those tests fixed presumably they'll need the time as well.



--
This message was sent by Atlassian JIRA
(v6.4.14#64029)

Mime
View raw message