hbase-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Matteo Bertozzi (JIRA)" <j...@apache.org>
Subject [jira] [Created] (HBASE-16519) Procedure v2 - Avoid sync wait on DDLs operation
Date Mon, 29 Aug 2016 19:36:21 GMT
Matteo Bertozzi created HBASE-16519:
---------------------------------------

             Summary: Procedure v2 - Avoid sync wait on DDLs operation
                 Key: HBASE-16519
                 URL: https://issues.apache.org/jira/browse/HBASE-16519
             Project: HBase
          Issue Type: Sub-task
          Components: master, proc-v2
    Affects Versions: 2.0.0
            Reporter: Matteo Bertozzi
            Assignee: Matteo Bertozzi
             Fix For: 2.0.0


Some operation ModifyColumnFamily, AddDeleteColumnFamily, DeleteColumnFamily, ModifyTable,
TruncateTable are still synchronous on the master side. with a wait until the operation completes
before returning. 
this was done to keep the sync behavior for old client. but instead of using the procLatch
which recognize the client version and decide if the operation should be sync or not it just
always wait. making the client side proc fault tolerance ineffective.

also the add/delete/modifyColumnFamily operation does not seems to follow the Async() naming
in master. and the comment claim to be async but everyone uses them as sync. (this is something
from HBASE-13538)



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message