hbase-commits mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From zg...@apache.org
Subject [hbase] 02/02: HBASE-21970 Document that how to upgrade from 2.0 or 2.1 to 2.2+
Date Sat, 02 Mar 2019 05:20:25 GMT
This is an automated email from the ASF dual-hosted git repository.

zghao pushed a commit to branch master
in repository https://gitbox.apache.org/repos/asf/hbase.git

commit f8e84ca164c001fcc183e79118e7e0cdeaae49e3
Author: Guanghao Zhang <zghao@apache.org>
AuthorDate: Thu Feb 28 17:45:39 2019 +0800

    HBASE-21970 Document that how to upgrade from 2.0 or 2.1 to 2.2+
---
 src/main/asciidoc/_chapters/upgrading.adoc | 14 ++++++++++++++
 1 file changed, 14 insertions(+)

diff --git a/src/main/asciidoc/_chapters/upgrading.adoc b/src/main/asciidoc/_chapters/upgrading.adoc
index da0dac0..2a33e42 100644
--- a/src/main/asciidoc/_chapters/upgrading.adoc
+++ b/src/main/asciidoc/_chapters/upgrading.adoc
@@ -314,6 +314,20 @@ Quitting...
 
 == Upgrade Paths
 
+[[upgrade 2.2]]
+=== Upgrade from 2.0 or 2.1 to 2.2+
+
+HBase 2.2+ uses a new Procedure form assiging/unassigning/moving Regions. It does not process
HBase 2.1 and 2.0's Unassign/Assign Procedure types. Upgrade requires that we first drain
the Master Procedure Store of old style Procedures before starting the new 2.2 Master. So
you need to make sure that before you kill the old version (2.0 or 2.1) Master, there is no
region in transition. And once the new version (2.2+) Master is up, you can rolling upgrade
RegionServers one by one.
+
+And there is a more safer way if you are running 2.1.1+ or 2.0.3+ cluster. It need four steps
to upgrade Master.
+
+. Shutdown both active and standby Masters (Your cluster will continue to server reads and
writes without interruption).
+. Set the property hbase.procedure.upgrade-to-2-2 to true in hbase-site.xml for the Master,
and start only one Master, still using the 2.1.1+ (or 2.0.3+) version.
+. Wait until the Master quits. Confirm that there is a 'READY TO ROLLING UPGRADE' message
in the Master log as the cause of the shutdown. The Procedure Store is now empty.
+. Start new Masters with the new 2.2+ version.
+
+Then you can rolling upgrade RegionServers one by one. See link:https://issues.apache.org/jira/browse/HBASE-21075[HBASE-21075]
for more details.
+
 [[upgrade2.0]]
 === Upgrading from 1.x to 2.x
 


Mime
View raw message