From "Pavel Pervov" <pmcfi...@gmail.com>
Subject Re: Releasing scheduling
Date Fri, 18 Apr 2008 16:14:35 GMT
Vasily,

HARMONY-5750 changes are in trunk.

Pavel.
On 4/18/08, Vasily Levchenko <vasily.v.levchenko@gmail.com> wrote:
> Hello folks,
> Have you got any updates about commitment of
> H-5750<https://issues.apache.org/jira/browse/HARMONY-5750>.
>
>
> About testing.
> We've discussed it with some folks, but I don't know how it complex for
> testing system of Harmony.
> Actually the functionality we need is used for recalculating stack maps
> after instrumentation. There is a subproject of TPTP called Probekit that
> injects probes into compiled code. But for re-calculation requires valid JNI
> pointer (you can find some details in
> https://bugs.eclipse.org/bugs/show_bug.cgi?id=148629). So minimize test it
> possible re-use static instrumentator with introduced in the same bugzilla
> java6 support but for static instrumentation.
>
> Is it ok with you?
>
> On Fri, Apr 18, 2008 at 10:34 AM, Alexei Fedotov <alexei.fedotov@gmail.com>
> wrote:
>
> > Nathan, thanks for a question!
> >
> > > Is VS6 needed to appropriately test this issue [1]? [...] are there
> > specific tests that could be run to get a general
> > > assurance of the passivity?
> >
> > I was asking Vasily to prepare at least one stand-alone test to be
> > included (by me) in a Harmony test base. While the whole TPTP requires
> > VC6, I believe I will be able to recompile the only test with a newer
> > compiler.
> >
> > With best regards, Alexei
> >
> >
> >
> > On Fri, Apr 18, 2008 at 5:27 AM, Nathan Beyer <ndbeyer@apache.org> wrote:
> > > Is VS6 needed to appropriately test this issue [1]? I'm not intimate
> > with
> > >  the verifier; are there specific tests that could be run to get a
> > general
> > >  assurance of the passivity?
> > >
> > >  -Nathan
> > >
> > >  [1] https://issues.apache.org/jira/browse/HARMONY-5750
> > >
> > >  On Thu, Apr 17, 2008 at 2:22 PM, Vasily Levchenko <
> > >
> > > vasily.v.levchenko@gmail.com> wrote:
> > >
> > >
> > > > Greetings,
> > >  > We've finally established source base and launched our test,
> > demonstrating
> > >  > stability and reliable of verifier code. would you mind to initiate
> > with
> > >  > releasing milestone HDK-M5.5_Eclipse_TPTP?
> > >  >
> > >  > As I've mentioned earlier but wasn't able point to JIRA (
> > >  > https://issues.apache.org/jira/browse/HARMONY-5750) we're extremely
> > >  > interested this patch to be included.
> > >  >
> > >  > On Mon, Apr 14, 2008 at 9:15 AM, Stepan Mishura <
> > stepan.mishura@gmail.com<
> > https://mail.google.com/mail?view=cm&tf=0&to=stepan.mishura@gmail.com>
> > >  > >
> > >  > wrote:
> > >  >
> > >  > > On 4/14/08, Vasily Levchenko <vasily.v.levchenko@gmail.com<
> > https://mail.google.com/mail?view=cm&tf=0&to=vasily.v.levchenko@gmail.com
> > >>
> > >
> > > > wrote:
> > >  > > > On Mon, Apr 14, 2008 at 8:32 AM, Stepan Mishura <
> > >  > > stepan.mishura@gmail.com<
> > https://mail.google.com/mail?view=cm&tf=0&to=stepan.mishura@gmail.com>
> > >
> > >
> > > > >
> > >  > > > wrote:
> > >  > > >
> > >  > > > > Hi folks,
> > >  > > > >
> > >  > > > > As I understood the thread it is doable to make interim
release
> > >  > > > > targeted to assist inclusion of Harmony verifier to the
nearest
> > >  > > > > Eclipse TPTP release. Let me share my understanding of
the
> > request
> > >  > and
> > >  > > > > a possible way to resolve it (please correct me if I'm
wrong):
> > The
> > >  > > > > Eclipse team needs an 'official' (i.e. published on the
> > web-site as
> > >  > > > > milestone build) Harmony release. The Eclipse team only
> > interesting
> > >  > in
> > >  > > > > changes in verifier since M5 so the main criteria for
the
> > interim
> > >  > > > > release is no regressions in verifier functionality (i.e.
I
> > assume
> > >  > > > > that not critical regressions are acceptable for interim
> > release. I
> > >  > > > > believe that is important for having a shorten
> > freeze/test/release
> > >  > > > > period for the interim release)
> > >  > > > >
> > >  > > > > So I think we may consider:
> > >  > > > > - making sure that all artifacts required are in place
(i.e.
> > >  > committed
> > >  > > > > to the trunk)
> > >  > > > > - declaring short code freeze
> > >  > > > > - running testing cycle to see if there are any issues
with
> > verifier
> > >  > > > > and overall code.  (BTW, are there any know issues with
> > verifier
> > >  > that
> > >  > > > > needs to be fixed?)
> > >  > > > >
> > >  > > > > Having said that I thought that we are testing up to 6
> > snapshots per
> > >  > > > > week so we may pick up any interim snapshot that has everything
> > >  > > > > required and shows good testing results, make it 'official'
-
> > i.e.
> > >  > > > > publish it ... with proper label - M5.5_Eclipse or something
> > else to
> > >  > > > > avoid confusions and to state clearly that the release
it
> > targeted
> > >  > to
> > >  > > > > the Eclipse TPTP release.
> > >  > > > >
> > >  > > > > Does it make sense and works for all parties?
> > >  > > > >
> > >  > > > > The only issue that still unclear for me is ABI requirements:
> > has
> > >  > the
> > >  > > > > Harmony team build/test the code to satisfy ABI or you
can do
> > it?
> > >  > > > > (Alexey Petrenko asked this before but I don't see any
answer)
> > >  > > >
> > >  > > >
> > >  > > > I suppose we can do it, but it should be in the released package
> > too.
> > >  > If
> > >  > > > we're going to share building of the module how it will looks
> > like?
> > >  > > > 1. you'll give us revision
> > >  > > > 2. and we'll return the compiled libraries
> > >  > > >
> > >  > > > or some other way?
> > >  > > >
> > >  > >
> > >  > > OK as I see from your answer - the Harmony team has to build
> > binaries
> > >  > > that satisfy ABI (because we publish binaries that are created only
> > by
> > >  > > Harmony committers.)
> > >  > >
> > >  > > -Stepan.
> > >  > >
> > >  > > <SNIP>
> > >  > >
> > >  >
> > >  >
> > >  >
> > >  > --
> > >  > --vvl
> > >  >
> > >
> >
> >
> >
> > --
> > With best regards,
> > Alexei
> >
>
>
>
> --
> --vvl
>


-- 
Pavel Pervov,
Intel Enterprise Solutions Software Division