harmony-commits mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Stepan Mishura (JIRA)" <j...@apache.org>
Subject [jira] Resolved: (HARMONY-4018) [testing] BT 2.0 adapter for Stress test suite
Date Thu, 21 Jun 2007 10:23:26 GMT

     [ https://issues.apache.org/jira/browse/HARMONY-4018?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Stepan Mishura resolved HARMONY-4018.
-------------------------------------

    Resolution: Fixed

Thanks Ilya, Vladimir - the patch was applied to BTI branch 2.0 at r549444. 
Please check that the patch was applied as you expected.

> [testing] BT 2.0 adapter for Stress test suite
> ----------------------------------------------
>
>                 Key: HARMONY-4018
>                 URL: https://issues.apache.org/jira/browse/HARMONY-4018
>             Project: Harmony
>          Issue Type: Test
>          Components: build - test - ci
>            Reporter: Ilya Neverov
>            Assignee: Stepan Mishura
>            Priority: Minor
>         Attachments: stress_bt20.patch, stress_bt20.patch, stress_bt20.patch, stress_ts.bt2.070601.zip
>
>
> I created BT 2.0 adapter for running Stress test suite [HARMONY-3536] in new build-test
infrastructure. The adapter was checked with recent revision of the BT 2.0 framework and with
recent HDK snapshots (ia32, Windows and Linux). That runs completed without BT2 errors but
some test failures occurred. 
> This adapter was derived from sources of adapter for the VTS VM testsuite [HARMONY-3206].
And the Stress testsuite depends on some tools contributed along with the VTS VM testsuite
so that suites together form natural train for integration into tests tree of the build-test
infrastructure. 
> Thank you 
> -Ilya 

-- 
This message is automatically generated by JIRA.
-
You can reply to this email to add a comment to the issue online.


Mime
View raw message