hadoop-yarn-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hadoop QA (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (YARN-2913) Fair scheduler should have ability to set MaxResourceDefault for each queue
Date Thu, 22 Oct 2015 21:39:27 GMT

    [ https://issues.apache.org/jira/browse/YARN-2913?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14969950#comment-14969950
] 

Hadoop QA commented on YARN-2913:
---------------------------------

\\
\\
| (x) *{color:red}-1 overall{color}* |
\\
\\
|| Vote || Subsystem || Runtime || Comment ||
| {color:blue}0{color} | pre-patch |  17m 29s | Pre-patch trunk compilation is healthy. |
| {color:green}+1{color} | @author |   0m  0s | The patch does not contain any @author tags.
|
| {color:green}+1{color} | tests included |   0m  0s | The patch appears to include 1 new
or modified test files. |
| {color:green}+1{color} | javac |   8m  9s | There were no new javac warning messages. |
| {color:green}+1{color} | javadoc |  10m 36s | There were no new javadoc warning messages.
|
| {color:green}+1{color} | release audit |   0m 26s | The applied patch does not increase
the total number of release audit warnings. |
| {color:red}-1{color} | checkstyle |   0m 50s | The applied patch generated  2 new checkstyle
issues (total was 37, now 35). |
| {color:green}+1{color} | whitespace |   0m  0s | The patch has no lines that end in whitespace.
|
| {color:green}+1{color} | install |   1m 32s | mvn install still works. |
| {color:green}+1{color} | eclipse:eclipse |   0m 34s | The patch built with eclipse:eclipse.
|
| {color:green}+1{color} | findbugs |   1m 31s | The patch does not introduce any new Findbugs
(version 3.0.0) warnings. |
| {color:red}-1{color} | yarn tests |  56m  4s | Tests failed in hadoop-yarn-server-resourcemanager.
|
| | |  97m 16s | |
\\
\\
|| Reason || Tests ||
| Failed unit tests | hadoop.yarn.server.resourcemanager.scheduler.fifo.TestFifoScheduler
|
|   | hadoop.yarn.server.resourcemanager.applicationsmanager.TestAMRestart |
\\
\\
|| Subsystem || Report/Notes ||
| Patch URL | http://issues.apache.org/jira/secure/attachment/12768102/YARN-2913.v4.patch
|
| Optional Tests | javadoc javac unit findbugs checkstyle |
| git revision | trunk / 960201b |
| checkstyle |  https://builds.apache.org/job/PreCommit-YARN-Build/9530/artifact/patchprocess/diffcheckstylehadoop-yarn-server-resourcemanager.txt
|
| hadoop-yarn-server-resourcemanager test log | https://builds.apache.org/job/PreCommit-YARN-Build/9530/artifact/patchprocess/testrun_hadoop-yarn-server-resourcemanager.txt
|
| Test Results | https://builds.apache.org/job/PreCommit-YARN-Build/9530/testReport/ |
| Java | 1.7.0_55 |
| uname | Linux asf903.gq1.ygridcore.net 3.13.0-36-lowlatency #63-Ubuntu SMP PREEMPT Wed Sep
3 21:56:12 UTC 2014 x86_64 x86_64 x86_64 GNU/Linux |
| Console output | https://builds.apache.org/job/PreCommit-YARN-Build/9530/console |


This message was automatically generated.

> Fair scheduler should have ability to set MaxResourceDefault for each queue
> ---------------------------------------------------------------------------
>
>                 Key: YARN-2913
>                 URL: https://issues.apache.org/jira/browse/YARN-2913
>             Project: Hadoop YARN
>          Issue Type: Bug
>            Reporter: Siqi Li
>            Assignee: Siqi Li
>         Attachments: YARN-2913.v1.patch, YARN-2913.v2.patch, YARN-2913.v3.patch, YARN-2913.v4.patch
>
>
> Queues that are created on the fly have the max resource of the entire cluster. Fair
Scheduler should have a default maxResource to control the maxResource of those queues



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message