Subject [jira] [Commented] (YARN-2604) Scheduler should consider max-allocation-* in conjunction with the largest node
Date Fri, 31 Oct 2014 21:59:34 GMT

    [ https://issues.apache.org/jira/browse/YARN-2604?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14192576#comment-14192576
] 

Hadoop QA commented on YARN-2604:
---------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12678549/YARN-2604.patch
  against trunk revision 1b4be91.

    {color:green}+1 @author{color}.  The patch does not contain any @author tags.

    {color:green}+1 tests included{color}.  The patch appears to include 1 new or modified
test files.

    {color:green}+1 javac{color}.  The applied patch does not increase the total number of
javac compiler warnings.

    {color:green}+1 javadoc{color}.  There were no new javadoc warning messages.

    {color:green}+1 eclipse:eclipse{color}.  The patch built with eclipse:eclipse.

    {color:green}+1 findbugs{color}.  The patch does not introduce any new Findbugs (version
2.0.3) warnings.

    {color:green}+1 release audit{color}.  The applied patch does not increase the total number
of release audit warnings.

    {color:red}-1 core tests{color}.  The patch failed these unit tests in hadoop-yarn-project/hadoop-yarn/hadoop-yarn-server/hadoop-yarn-server-resourcemanager:

                  org.apache.hadoop.yarn.server.resourcemanager.applicationsmanager.TestAMRestart
                  org.apache.hadoop.yarn.server.resourcemanager.scheduler.capacity.TestContainerAllocation
                  org.apache.hadoop.yarn.server.resourcemanager.scheduler.fair.TestFairScheduler
                  org.apache.hadoop.yarn.server.resourcemanager.scheduler.capacity.TestCapacityScheduler

    {color:green}+1 contrib tests{color}.  The patch passed contrib unit tests.

Test results: https://builds.apache.org/job/PreCommit-YARN-Build/5668//testReport/
Console output: https://builds.apache.org/job/PreCommit-YARN-Build/5668//console

This message is automatically generated.

> Scheduler should consider max-allocation-* in conjunction with the largest node
> -------------------------------------------------------------------------------
>
>                 Key: YARN-2604
>                 URL: https://issues.apache.org/jira/browse/YARN-2604
>             Project: Hadoop YARN
>          Issue Type: Improvement
>          Components: scheduler
>    Affects Versions: 2.5.1
>            Reporter: Karthik Kambatla
>            Assignee: Robert Kanter
>         Attachments: YARN-2604.patch
>
>
> If the scheduler max-allocation-* values are larger than the resources available on the
largest node in the cluster, an application requesting resources between the two values will
be accepted by the scheduler but the requests will never be satisfied. The app essentially
hangs forever. 



--
This message was sent by Atlassian JIRA