hadoop-yarn-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Andrey Stepachev (JIRA)" <j...@apache.org>
Subject [jira] [Updated] (YARN-2145) FairScheduler can assign more resources to queue with MaxShare set.
Date Wed, 11 Jun 2014 12:41:02 GMT

     [ https://issues.apache.org/jira/browse/YARN-2145?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Andrey Stepachev updated YARN-2145:
-----------------------------------

    Attachment: YARN-2145.diff

> FairScheduler can assign more resources to queue with MaxShare set.
> -------------------------------------------------------------------
>
>                 Key: YARN-2145
>                 URL: https://issues.apache.org/jira/browse/YARN-2145
>             Project: Hadoop YARN
>          Issue Type: Bug
>          Components: fairscheduler
>    Affects Versions: 2.5.0
>            Reporter: Andrey Stepachev
>         Attachments: YARN-2145.diff
>
>
> method fair.FSQueue#assignContainerPreCheck() uses Resources.fitsIn incorrectly, because
if queue is at it maximum method returns true and container can be assigned to queue with
maximum resources consumed.
> That is because fetsIn code do <= comparison and if allocated resources == max resources
fitsIn still returns true, and consequently pre check successes and node have been assigned
to overloaded queue.
> {code}
>   public static boolean fitsIn(Resource smaller, Resource bigger) {
>     return smaller.getMemory() <= bigger.getMemory() &&
>         smaller.getVirtualCores() <= bigger.getVirtualCores();
>   }
> {code}



--
This message was sent by Atlassian JIRA
(v6.2#6252)

Mime
View raw message