hadoop-mapreduce-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Hadoop QA (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (MAPREDUCE-4502) Node-level aggregation with combining the result of maps
Date Tue, 03 Dec 2013 15:44:20 GMT

    [ https://issues.apache.org/jira/browse/MAPREDUCE-4502?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=13837809#comment-13837809
] 

Hadoop QA commented on MAPREDUCE-4502:
--------------------------------------

{color:red}-1 overall{color}.  Here are the results of testing the latest attachment 
  http://issues.apache.org/jira/secure/attachment/12592783/MAPREDUCE-4502.10.patch
  against trunk revision .

    {color:red}-1 patch{color}.  The patch command could not apply the patch.

Console output: https://builds.apache.org/job/PreCommit-MAPREDUCE-Build/4241//console

This message is automatically generated.

> Node-level aggregation with combining the result of maps
> --------------------------------------------------------
>
>                 Key: MAPREDUCE-4502
>                 URL: https://issues.apache.org/jira/browse/MAPREDUCE-4502
>             Project: Hadoop Map/Reduce
>          Issue Type: Improvement
>          Components: applicationmaster, mrv2
>    Affects Versions: 3.0.0
>            Reporter: Tsuyoshi OZAWA
>            Assignee: Tsuyoshi OZAWA
>         Attachments: MAPREDUCE-4502.1.patch, MAPREDUCE-4502.10.patch, MAPREDUCE-4502.2.patch,
MAPREDUCE-4502.3.patch, MAPREDUCE-4502.4.patch, MAPREDUCE-4502.5.patch, MAPREDUCE-4502.6.patch,
MAPREDUCE-4502.7.patch, MAPREDUCE-4502.8.patch, MAPREDUCE-4502.8.patch, MAPREDUCE-4502.9.patch,
MAPREDUCE-4502.9.patch, MAPREDUCE-4525-pof.diff, design_v2.pdf, design_v3.pdf, speculative_draft.pdf
>
>
> The shuffle costs is expensive in Hadoop in spite of the existence of combiner, because
the scope of combining is limited within only one MapTask. To solve this problem, it's a good
way to aggregate the result of maps per node/rack by launch combiner.
> This JIRA is to implement the multi-level aggregation infrastructure, including combining
per container(MAPREDUCE-3902 is related), coordinating containers by application master without
breaking fault tolerance of jobs.



--
This message was sent by Atlassian JIRA
(v6.1#6144)

Mime
View raw message