Aaron T. Myers commented on HDFS-5138:
--------------------------------------

bq. In documentation you say " [[2]] Both NNs must be started with the <<<'-upgrade'>>>
flag." Does this mean both the namenodes should be available during upgrade or does it just
mean that namenodes must be started with -upgrade. One of the namenode can first upgrade (and
possibly be finalized) and later second NN can be upgraded?

Closer to the latter. OneNN can first upgrade, and even do the upgrade of the shared log,
and later the second NN can be started with the -upgrade flag. It will see that an upgrade
is in progress by presence of the shared log lock  and do its local upgrade with that CTime.
One cannot, however, start the second NN with the -upgrade flag after the upgrade has been
finalized, since doing so removes the shared log lock.

bq. When active namenode is performing shared edits upgrade, if it fails, does fail over occur
to the standby and does the new active resume the upgrade? Same question for finalize and
rollback.

i.e. if it fails to upgrade the shared log? That NN woud shut down and when the other NN became
active (either manually or automatically) yes, it would try to upgrade the shared log at that
time. Finalization - no, failure of that procedure would require the admin to re-attempt the
finalization once the system was back up, and finalization requires both NNs to be running.

bq. In documentation "The operator should run the roll back command on one of the NN boxes,...",
could have issues related to which NN is chosen. It must be on the one where upgrade has been
previously done right?

Well, I had been assuming that both NNs had already been upgraded, in which case no, it doesn't
matter which NN does the rollback. If the NN you tried to run rollback from had not in fact
already been upgraded then it won't let you start with the '-rollback' option.

bq. Given the rollback procedure, where bootstrapStandby muste be done on one of the NNs,
why not just upgrade a single namenode (without worrying about two namenodes racing to upgrade
etc.) and just follow the same procedure as rollback to simplify this?

That would certainly simplify the code quite a bit, since we could just assume that only one
NN is running during the actual upgrade procedure, and I considered this option. Doing so
means that there'd be some asymmetry between the two nodes involved in the whole HA upgrade
procedure, e.g. you would then _have_ to do the rollback on the NN where you initiated the
upgrade, but perhaps that's acceptable since layout version upgrades are relatively rare.
If you'd be more comfortable with this approach then I can think about what it would take
to rework the patch.

bq. Another thing that comes mind is, the lock files are created on JNs. What if lock file
was created on all but was deleted only on two. How does the presence of lock file on a JN
affect the system?

In that case the finalization would fail and would need to be re-attempted.

bq. FSNamesystem.java. I see that IDEs expand a.b.c.* imports to individual imports. You are
changing it back to a.b.c.* in your patch.

Yea, that's where I recall resolving import conflicts. I'll take a look and fix those once
I hear back from you on the above.

> Support HDFS upgrade in HA
> --------------------------
>
>                 Key: HDFS-5138
>                 URL: https://issues.apache.org/jira/browse/HDFS-5138
>             Project: Hadoop HDFS
>          Issue Type: Bug
>    Affects Versions: 2.1.1-beta
>            Reporter: Kihwal Lee
>            Assignee: Aaron T. Myers
>            Priority: Blocker
>         Attachments: HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch,
HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch, HDFS-5138.patch
>
>
> With HA enabled, NN wo't start with "-upgrade". Since there has been a layout version
change between 2.0.x and 2.1.x, starting NN in upgrade mode was necessary when deploying 2.1.x
to an existing 2.0.x cluster. But the only way to get around this was to disable HA and upgrade.

> The NN and the cluster cannot be flipped back to HA until the upgrade is finalized. If
HA is disabled only on NN for layout upgrade and HA is turned back on without involving DNs,
things will work, but finaliizeUpgrade won't work (the NN is in HA and it cannot be in upgrade
mode) and DN's upgrade snapshots won't get removed.
> We will need a different ways of doing layout upgrade and upgrade snapshot.  I am marking
this as a 2.1.1-beta blocker based on feedback from others.  If there is a reasonable workaround
that does not increase maintenance window greatly, we can lower its priority from blocker
to critical.



--