That's not a question I'm qualified to answer. I do know we're now buying an Arista for a different
cluster, but there's probably loads others out there.

*forwarded to general@...*

________________________________________
From: Abhishek Mehta [abhishek@tresata.com]
Sent: Thursday, June 30, 2011 11:38 PM
To: Evert Lammerts
Subject: Fwd: Hadoop Java Versions

what are the other switch options (other than cisco that is?)?

cheers


Abhishek Mehta
(e) abhishek@tresata.com<mailto:abhishek@tresata.com>
(v) 980.355.9855

Begin forwarded message:

From: Evert Lammerts <Evert.Lammerts@sara.nl<mailto:Evert.Lammerts@sara.nl>>
Date: June 30, 2011 5:31:26 PM EDT
To: "general@hadoop.apache.org<mailto:general@hadoop.apache.org>" <general@hadoop.apache.org<mailto:general@hadoop.apache.org>>
Subject: RE: Hadoop Java Versions
Reply-To: general@hadoop.apache.org<mailto:general@hadoop.apache.org>

You can get 12-24 TB in a server today, which means the loss of a server
generates a lot of traffic -which argues for 10 Gbe.

But
 -big increase in switch cost, especially if you (CoI warning) go with
Cisco
 -there have been problems with things like BIOS PXE and lights out
management on 10 Gbe -probably due to the NICs being things the BIOS
wasn't expecting and off the mainboard. This should improve.
 -I don't know how well linux works with ether that fast (field reports
useful)
 -the big threat is still ToR switch failure, as that will trigger a
re-replication of every block in the rack.

Keeping the amount of disks per node low and the amount of nodes high should keep the impact
of dead nodes in control. A ToR switch failing is different - missing 30 nodes (~120TB) at
once cannot be fixed by adding more nodes; that actually increases ToR switch failure. Although
such failure is quite rare to begin with, I guess. The back-of-the-envelope-calculation I
made suggests that ~150 (1U) nodes should be fine with 1Gb ethernet. (e.g., when 6 nodes fail
in a cluster with 150 nodes with four 2TB disks each, with HDFS 60% full, it takes around
~32 minutes to recover. 2 nodes failing should take around 640 seconds. Also see the attached
spreadsheet.) This doesn't take ToR switch failure in account though. On the other hand -
150 nodes is only ~5 racks - in such a scenario you might rather want to shut the system down
completely rather than letting it replicate 20% of all data.

Cheers,