+1.

Oh yeah, I agree. Let's give it a shot with all the best that we have.

Cheers
Prasad

On 12/5/06, Paul McMahan <paulmcmahan@gmail.com> wrote:
> Matt,  JEE5 is critical to the widespread adoption of Geronimo.  We
> can and should accomplish these milestones.
>
> Best wishes,
> Paul
>
> On 12/4/06, Matt Hogstrom <matt@hogstrom.org> wrote:
> > While ripping out drywall this weekend I was thinking about our
> > Geronimo 2.0 and all the work that needs to get done to complete this
> > monsterous effort.   While sifting through the scorecard and thinking
> > about all the different things that need to be addressed it became a
> > bit overwhelming.  As everyone knows many different projects are
> > working on their implementations of Java EE 5.0.  Some are available
> > and others are works in progress (as is ours).  It seems that from
> > user perspective people are really interested in the Java EE and have
> > been asking for several months about where we are.  At this point it
> > would be nice to give them an idea of what we're thinking about.
> >
> > I had previously put out a set of milestones and dates.  I wanted to
> > make it a little more formal and of course with all the caveats that
> > this is open source and our timetables are subject to people's time
> > and contribution.
> >
> > With that, here is an updated timeline and some graphic
> > representations that represent the Java EE specifications that need
> > to be completed from a high level.
> >
> > I think it was Dain that used the term table stakes when referring to
> > the specification.  Meaning that we need the spec related
> > functionality to get in the game but innovations beyond the
> > specification were necessary to make a bigger splash.  I don't
> > capture those here but I'll work on pulling that together as well.
> >
> > Take a look at http://people.apache.org/~hogstrom/Geronimo2.0/ and
> > provide your thoughts on how were doing.
> >
> > If we are going to make a Dec 22 Beta 1 then we would have to cut
> > sometime in the next week and a half.
> >
> > What do y'all think?
> >
> > Matt Hogstrom
> > matt@hogstrom.org
> >
> >
> >
>