I am heading to the airport soon.  Won't be online until Wed evening in 
San Diego.

I wish we had more time to do some testing, there have been a lot of 
changes lately..

The following needs to be done by someone else:

* GERONIMO-1286 (CRLF/LF in distributions) changes needs to be ported to 
the new build from modules/assembly/maven.xml.
* GERONIMO-1151 "Changing EJB port from 4201 to another value in 
config.xml does not take effect" needs to be fixed... also need to test 
other attributes.

The following I plan on doing (after the freeze if possible) for the 1.0 
release

* GERONIMO-1166 Startup scripts - I had hoped to get these committed 
before travelling, but spent time chasing build problems.   I plan on 
doing some more testing with these scripts and commit them on Thursday 
8th Dec.  The scripts are based on what was agreed in the  
http://www.mail-archive.com/dev@geronimo.apache.org/msg12524.html mail 
thread.  I have attached my current work as a patch to the JIRA.

* GERONIMO-1266 Geronimo Izpack installer does not set shell scripts as 
executable - depends upon GERONIMO-1166 being finished, since there will 
be different file names that need to be set executable.  Not sure if 
1266 is really a show stopper, but would be nice if users didn't need to 
chmod scripts after installing..

John

Matt Hogstrom wrote:

> All,
>
> We've made a lot of progress over the weekend and the past few days in 
> terms of testing, bug fixing as well as new features.  At this point 
> though we are running out of time and need to shift from features to 
> finish and testing to make sure we're putting out the best offering we 
> can.  Given that there are a few things we need to do and I need your 
> help.
>
> First, we need to manage our way out of the outstanding 98 JIRAs for 
> 1.0.  I would like to ask everyone that has a JIRA for 1.0 (either 
> reported by you and unassigned or assigned to you) to please quickly 
> review it and prioritize it appropriately.  The assignment should be:
>
> 1.0 (absolutely needs to be in ... stop ship if its in this category)
> 1.1 (important but can be addressed later)
> 1.x (sooner than later but not immediately urgent)
> wishlist (self explanatory)
>
> Please do this today.  If you absolutely cannot let me know and I'll 
> defer them for you :)
>
> Because we need to finish TCK testing as well as test the packaging 
> and installer I would like to make today the last day for fixing 
> function / features..  I propose we cut a 1.0 branch tonight so we can 
> fix things like missing content in the console and other items that 
> will be removed from Geronimo that need to remain in HEAD for further 
> development.
>
> Also, we will make the final cutover of versions from SNAPSHOTs to 
> their released versions for TranQL, Open EJB, and Axis.  I think we 
> have everything else taken care of.
>
> Preferrably it would be great if we can start a vote on Friday for a 
> release assuming we get the remaining work completed.
>
> Please respond to this e-mail with outstanding urgent issues that need 
> to be completed.  Here is a start for this activity:
>
> * Remove broken / non-functional links in the console
> * Installer work completed
> * Testing of sample apps to ensure we have not regressed
>
> I'm sure there are lits of other items.  Let's get them in here and 
> I'll update the release managemetn page.
>