Aaron Mulder wrote:
> The things I'd like to see in 1.0 are:
>
> - More console work
> - Remote deployment
> - Hot deploy directory
> - Bundled JavaMail with SMTP support
> - Separate Jetty and Tomcat ZIP/TAR distributions
> - A working installer distribution
> - Bug fixes
>
> I'm not that keen on introducing clustering, WADI, or extra LDAP
> integration if they are going to impact the stability/testing for 1.0
> -- that's the kind of stuff I'd prefer to put in a branch until after
> the release.
No reason that clustering would impact stability at all. They are just
GBeans in a normally off position since 95% of the users won't need them on.
LDAP is fully integrated and was part of the M5 release. Whats the
issue here?
>
> Thanks,
> Aaron
>
> On 11/7/05, Matt Hogstrom <matt@hogstrom.org> wrote:
>> I saw the Virtuas announcement last week based on their Geronimo support. Very
>> nice. One thing that caught my eye on their web site was 36 days to ApacheCon.
>> It made me realize that in order to make 1.0 we only have 30 something days to
>> make it. With CTS and Thanksgiving in between there is not a lot of time to get
>> all the things done we want.
>>
>> Here is a list of items that have been going around on the list and wanted to
>> get people's feedback in terms of what has to be there for 1.0 and my initial
>> SWAG as to the importance. Please feel free to comment / change the items below
.
>>
>> Console patches and UI updates (example User & Group Mgt for console).
>> Gbean for Tomcat for clustering (Jeff G)
>> WADI integration (tech preview possibly, not required)
>> Directory restructure (will be done after TCK is verified... we want to control
>> the number of changes)
>> JavaMail
>> LDAP Apache Directory (using Tomcat)
>> Debug Console
>> Remote Deploy
>> DayTrader
>> Install - maven update needed
>> Hot Deploy (file based) (Jacek)
>> Packaging changes (Maven respository) wait for Dave J. Dain indicated that
>> maven code won't make 1.0.
>>
>> In addition to that there are a number of JIRAs out there as well. I noticed a
>> lot of activity in getting them closed so that is excellent. I'll finish
>> adjusting the fix version today to 1.0, 1.1 and 1.x. Once that's complete and
>> we agree on the JIRAs, features, etc. we can see where we'll land.
>>
>> My apologies for being behind on this.
>>
>> Cheers,
>>
>> Matt
>>
>>
|