flink-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Steven Langbroek (JIRA)" <j...@apache.org>
Subject [jira] [Assigned] (FLINK-7607) Web Frontend Hangs with Large Numbers of Tasks
Date Wed, 31 Jan 2018 10:19:00 GMT

     [ https://issues.apache.org/jira/browse/FLINK-7607?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel

Steven Langbroek reassigned FLINK-7607:

    Assignee: Steven Langbroek

> Web Frontend Hangs with Large Numbers of Tasks
> ----------------------------------------------
>                 Key: FLINK-7607
>                 URL: https://issues.apache.org/jira/browse/FLINK-7607
>             Project: Flink
>          Issue Type: Bug
>          Components: Webfrontend
>    Affects Versions: 1.3.2
>         Environment: Attempted to load the web frontend on a MacBook Pro 15" (late 2016)
with 16 GB of memory using both Chrome 60.0 and Safari 10.1.2.
>            Reporter: Joshua Griffith
>            Assignee: Steven Langbroek
>            Priority: Major
>              Labels: performance
> Viewing a job with a high number of tasks in the web front-end causes the page to hang,
consuming 100% CPU on a core. At 200 tasks the page slows noticeably and scrolling results
in long, non-responsive pauses. At 400 tasks the page only updates once per minute and is
almost entirely non-responsive.
> Initially, I thought this was caused by rendering a complex job graph but opening the
inspector and deleting the canvas did not improve page performance. Further inspection indicated
that the page was redrawing every DOM element in the task list on every update.
> A possible solution is to use an approach similar to [react-list|https://github.com/orgsync/react-list]
and only request data/render list items that are in view and only update DOM nodes that have

This message was sent by Atlassian JIRA

View raw message