From Greg Hogan <c...@greghogan.com>
Subject Re: Master test stability poor
Date Wed, 27 Apr 2016 12:01:46 GMT
We have also started running over Travis' 2 hour limit for the longest build.

Greg


> On Apr 27, 2016, at 7:53 AM, Ufuk Celebi <uce@apache.org> wrote:
> 
> Hi Till,
> 
> thank you for bringing this up. We really need to fix this.
> 
> Filing JIRAs with critical priority was how we tried to solve it in
> the past, but obviously it did not work. There seems to be a mismatch
> between assigned and actual priorities.
> 
> As a first step, I would volunteer to gather a list of tests, which
> have failed in the last weeks and make sure that we have JIRAs for
> them.
> 
> As a next step, we should coordinate how to resolve those issues
> (maybe prioritized by failure frequency) to get master stable again.
> 
> – Ufuk
> 
> 
>> On Wed, Apr 27, 2016 at 12:12 PM, Till Rohrmann <trohrmann@apache.org> wrote:
>> Hi Flink community,
>> 
>> I just wanted to raise awareness that in the last 16 days there was just a
>> single Travis build of master which passed all tests. This indicates that
>> we have some serious problems with our test stability or even worse a
>> problem with the master itself. Having an unstable master makes it really
>> hard to assess whether new changes actually broke something or whether the
>> failing test was unrelated.
>> 
>> We have currently 37 open issues labeled with test-stability and most of
>> them have a critical priority. Therefore, I would propose that we try to
>> tackle them as soon as possible in order to improve our testing stability.
>> 
>> Cheers,
>> Till