flink-commits mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From fhue...@apache.org
Subject [1/2] flink git commit: [FLINK-5249] [docs] Fix description of datastream rescaling to match the figure.
Date Tue, 06 Dec 2016 12:46:06 GMT
Repository: flink
Updated Branches:
  refs/heads/release-1.1 c7db532ab -> 7bb6b696c


[FLINK-5249] [docs] Fix description of datastream rescaling to match the figure.

This closes #2932.


Project: http://git-wip-us.apache.org/repos/asf/flink/repo
Commit: http://git-wip-us.apache.org/repos/asf/flink/commit/c567b0c2
Tree: http://git-wip-us.apache.org/repos/asf/flink/tree/c567b0c2
Diff: http://git-wip-us.apache.org/repos/asf/flink/diff/c567b0c2

Branch: refs/heads/release-1.1
Commit: c567b0c285a848e89cef2553a78e790a6cc20804
Parents: c7db532
Author: David Anderson <david@alpinegizmo.com>
Authored: Sun Dec 4 15:32:23 2016 +0100
Committer: Fabian Hueske <fhueske@apache.org>
Committed: Tue Dec 6 13:45:03 2016 +0100

----------------------------------------------------------------------
 docs/apis/streaming/index.md | 13 ++++++-------
 1 file changed, 6 insertions(+), 7 deletions(-)
----------------------------------------------------------------------


http://git-wip-us.apache.org/repos/asf/flink/blob/c567b0c2/docs/apis/streaming/index.md
----------------------------------------------------------------------
diff --git a/docs/apis/streaming/index.md b/docs/apis/streaming/index.md
index 806ae4b..abc5df5 100644
--- a/docs/apis/streaming/index.md
+++ b/docs/apis/streaming/index.md
@@ -1016,19 +1016,18 @@ dataStream.rebalance();
             The subset of downstream operations to which the upstream operation sends
             elements depends on the degree of parallelism of both the upstream and downstream
operation.
             For example, if the upstream operation has parallelism 2 and the downstream operation
-            has parallelism 4, then one upstream operation would distribute elements to two
+            has parallelism 6, then one upstream operation would distribute elements to three
             downstream operations while the other upstream operation would distribute to
the other
-            two downstream operations. If, on the other hand, the downstream operation has
parallelism
-            2 while the upstream operation has parallelism 4 then two upstream operations
would
-            distribute to one downstream operation while the other two upstream operations
would
-            distribute to the other downstream operations.
+            three downstream operations. If, on the other hand, the downstream operation
has parallelism
+            2 while the upstream operation has parallelism 6 then three upstream operations
would
+            distribute to one downstream operation while the other three upstream operations
would
+            distribute to the other downstream operation.
         </p>
         <p>
             In cases where the different parallelisms are not multiples of each other one
or several
             downstream operations will have a differing number of inputs from upstream operations.
-
-        </p>
         </p>
+        <p>
             Please see this figure for a visualization of the connection pattern in the above
             example:
         </p>


Mime
View raw message