falcon-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Pallavi Rao (JIRA)" <j...@apache.org>
Subject [jira] [Commented] (FALCON-1403) Revisit IT cleanup and teardown
Date Wed, 19 Aug 2015 07:16:46 GMT

    [ https://issues.apache.org/jira/browse/FALCON-1403?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=14702623#comment-14702623
] 

Pallavi Rao commented on FALCON-1403:
-------------------------------------

[~nperiwal], patch looks fine apart from a minor comment that I have left on review board.

Can you check if there is any additional cost, in terms of time, because of the cleanup? Do
the tests take the same amount of time as before with this patch?

> Revisit IT cleanup and teardown
> -------------------------------
>
>                 Key: FALCON-1403
>                 URL: https://issues.apache.org/jira/browse/FALCON-1403
>             Project: Falcon
>          Issue Type: Improvement
>            Reporter: Narayan Periwal
>            Assignee: Narayan Periwal
>         Attachments: FALCON-1403-v0.patch
>
>
> Currently in many of the integration tests such as FalconCLIIT, FalconCLISmokeIT, etc..
there is not cleanup happening after the testcase runs; this leads to many entities getting
accumulated in memory, which in turn leads to tests failing due to out of memory error



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message