drill-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Chris Westin (JIRA)" <j...@apache.org>
Subject [jira] [Created] (DRILL-2515) Add allocator state verification at the end of test suites
Date Fri, 20 Mar 2015 23:33:38 GMT
Chris Westin created DRILL-2515:
-----------------------------------

             Summary: Add allocator state verification at the end of test suites
                 Key: DRILL-2515
                 URL: https://issues.apache.org/jira/browse/DRILL-2515
             Project: Apache Drill
          Issue Type: Bug
          Components: Tools, Build & Test
    Affects Versions: 0.8.0
            Reporter: Chris Westin
            Assignee: Chris Westin


In order to speed up testing, we've set up maven so that it reuses the JVM between test classes
in "mvn install". However, this means that if there are missing closures of allocators or
other resources, we don't find out until much later, after the offending test, instead of
in the test, as we would when running a JUnit test from an IDE.

The suggestion here is to add @AfterClass methods to base test classes that do some kind of
verification. We'll need to add something to the top level allocator that does the same verification
it does now in close(), but allows us to spot check it between tests. 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message