directory-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Alex Karasulu (JIRA)" <>
Subject [jira] Commented: (DIREVE-99) sync() operations blowing chunks
Date Fri, 03 Dec 2004 17:26:30 GMT
     [ ]
Alex Karasulu commented on DIREVE-99:

Found the problem.  Looks like the hooks running after a polite shutdown are bombing cuz the
db is already closed.  I think we can solve this easily but best thing to do would be to have
an isClosed() test method on both the Database interface and the BackingStore interface. 
Then this method can be tested before performing a close operation.

I'll implement this shortly.

> sync() operations blowing chunks
> --------------------------------
>          Key: DIREVE-99
>          URL:
>      Project: Directory Eve
>         Type: Bug
>     Reporter: Alex Karasulu
>     Assignee: Alex Karasulu
>     Priority: Minor
>      Fix For: 0.8.0

> Calls to sync() are failing and making lots of noice however effects are not felt.
> Here's the stack trace:

This message is automatically generated by JIRA.
If you think it was sent incorrectly contact one of the administrators:
If you want more information on JIRA, or have a bug to report see:

View raw message