It's exactly the same process to merge things from trunk to a branch
or from a branch to trunk afaik.  And in all cases, bugs can be fixed in the
branch before and backported to trunk or the reverse ;-)

On 6/26/07, Dan Diephouse <dan@envoisolutions.com> wrote:
> I'm ok with it either way. I was just thinking through things yesterday
> though and figured since we were probably going to have a short release
> cycle it might make sense to make /trunk 2.0.1 as its a PITA to merge
> changes back, but we can keep it as it is for now.
>
> On 6/26/07, Guillaume Nodet <gnodet@gmail.com> wrote:
> >
> > It seems to me that this is the usual process.
> > Keep trunk for the next major version and create
> > branches for maintenance branches.
> >
> > On 6/26/07, Bozhong Lin <blin@iona.com> wrote:
> > >
> > > Note current trunk pom version is "2.1-incubator-snapshot". Instead of
> > > asking people to create a branch for new features, another option would
> > > be to create a branch for 2.0.1 release, and let people continue use
> > > trunk for 2.1 release works. In this way, any fixes that go into trunk
> > > can be selectively merged to 2.0.1 release branch.
> > >
> > > We need to change pom version to "2.0.1-incubator-snapshot" anyway.
> > >
> > > Regards,
> > > Bo
> > >
> > > Dan Diephouse wrote:
> > > > I think there was some consensus in the previous thread about what to
> > do
> > > > with the release process. I think this leaves us with a few takeaways.
> > > > warning: some of my own opinions/desires are inter:
> > > >
> > > > 1. /trunk is 2.0.1-SNAPSHOT. No destabilizing changes should be made
> > > > to head
> > > > (not going to try to define this - I think its ultimately up to us to
> > > > make
> > > > judgement calls).
> > > >
> > > > 2. 2.0.1 should follow about 3-4 weeks from now. I.e. the week of the
> > > > 16th.
> > > >
> > > > 3. Any major changes should be done in a branch for now. I'm not sure
> > > > if we
> > > > should have a 2.1 branch or if we should just have branches for
> > > > individual
> > > > features. I'm guess probably just branches for individual features for
> > > > now
> > > > until 2.0.1 is released, and then we can merge everything into trunk.
> > > > Though
> > > > I think the JAX-WS 2.1, JAXB 2.1, and WS-SX stuff are all intertwined
> > at
> > > > least, so that will all need to happen in the same code base.
> > > >
> > > > 4. 2.1 Should probably happen as soon as we finish TCK testing. That
> > > > should
> > > > give anyone ample time to get new features in if they want. Any
> > features
> > > > which don't make it can go into 2.2, which should hopefully follow
> > 8-10
> > > > weeks after.
> > > >
> > > > Thoughts?
> > > >
> > > > - Dan
> > > >
> > >
> >
> >
> >
> > --
> > Cheers,
> > Guillaume Nodet
> > ------------------------
> > Principal Engineer, IONA
> > Blog: http://gnodet.blogspot.com/
> >
>
>
>
> --
> Dan Diephouse
> Envoi Solutions
> http://envoisolutions.com | http://netzooid.com/blog
>


-- 
Cheers,
Guillaume Nodet
------------------------
Principal Engineer, IONA
Blog: http://gnodet.blogspot.com/

Mime
View raw message