continuum-users mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From Emmanuel Venisse <emman...@venisse.net>
Subject Re: When builds are done in multi-module projects ?
Date Fri, 28 Sep 2007 09:20:23 GMT
I'll try to reproduce it.

Can you look at logs the "enqueuing" lines to see if projects are in the right order?

Do you have scm changes between each build?

Emmanuel

Damien Lecan a écrit :
>> It isn't recommended to have the same source tree twice in continuum if pom files
have the same version.
>> With this configuration, continuum can't resolve correctly the build order so a project
B that must be built after an other project A is built before, then when A is built, Continuum
detect a change
>> on it and build B
> 
> I set up another Continuum instance last night.
> I reset both installations : fresh database, fresh project checkouts
> 
> I used exactly same configuration described before, but each project
> copy was checked out on its own continuum instance.
> I reduced time between to executions from 1h to 30min to have enough
> results for this morning
> 
> Here are test results after 11h of tests
> 
>                                  GP1                GP2
> build status           all success      all success
> nb of BD exec             22                    22
> number of builds       2 to 18                 1
> 
> 
> Will you consider these tests results ? Or something else is wrong ?
> 
>  => 1 build definition : projects are built once, the first time
>  => 2 build definitions : projects are built many times more
> 
> I used to use several build definitions with Continuum 1.0.3 for the
> same project and it used to work fine.
> 
> Damien
> 
> 


Mime
View raw message