continuum-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Maria Catherine Tan (JIRA)" <j...@codehaus.org>
Subject [jira] Issue Comment Edited: (CONTINUUM-2616) Project state is still building after cancelling a build with distributed builds enabled
Date Fri, 26 Aug 2011 08:14:33 GMT

    [ https://jira.codehaus.org/browse/CONTINUUM-2616?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=277103#comment-277103
] 

Maria Catherine Tan edited comment on CONTINUUM-2616 at 8/26/11 3:13 AM:
-------------------------------------------------------------------------

I think for now we should disable the cancel button from the project group page if distributed
build is enabled and let the user cancel the build from the queues page instead.

In distributed build, it is possible to have 2 builds of the same project with different build
definition. So you won't know which build will be cancelled if you click the cancel button
from the project group page.

      was (Author: ctan):
    I think for now we should disable the cancel button from the project group page and let
the user cancel the build from the queues page instead.

In distributed build, it is possible to have 2 builds of the same project with different build
definition. So you won't know which build will be cancelled if you click the cancel button
from the project group page.
  
> Project state is still building after cancelling a build with distributed builds enabled
> ----------------------------------------------------------------------------------------
>
>                 Key: CONTINUUM-2616
>                 URL: https://jira.codehaus.org/browse/CONTINUUM-2616
>             Project: Continuum
>          Issue Type: Bug
>          Components: Distributed Builds
>            Reporter: Maria Catherine Tan
>            Assignee: Maria Catherine Tan
>             Fix For: 1.4.1 (Beta)
>
>
> To replicate:
> 1. Build a project
> 2. Wait for it to finish building successfully
> 3. The project state should be successful
> 4. Build the project again
> 5. Cancel the build from the queues page since there is a bug CONTINUUM-2614
> 6. The project is no longer building in the queues page
> 7. Build agent already cancelled the build
> Expected Result:
> - project state should be successful since that is its previous state
> Actual Result: 
> - project state is still building

--
This message is automatically generated by JIRA.
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Mime
View raw message