continuum-issues mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "SebbASF (JIRA)" <j...@codehaus.org>
Subject [jira] Created: (CONTINUUM-2428) Failed Build results do not always agree with e-mail
Date Sun, 10 Jan 2010 11:30:55 GMT
Failed Build results do not always agree with e-mail
----------------------------------------------------

                 Key: CONTINUUM-2428
                 URL: http://jira.codehaus.org/browse/CONTINUUM-2428
             Project: Continuum
          Issue Type: Bug
         Environment: Version:         1.3.4-SNAPSHOT
Build Number:   790494
            Reporter: SebbASF
            Priority: Critical
         Attachments: ContinuumBugs.zip

The e-mail sent for a failed build has a link to the build results.

One would expect the build outputs to agree with each other, but that is not always the case.

See the attached examples. Here is the build result summary covering the runs.
Corresponding buildId in () at the end

{code}
    Jan 08, 2010 06:29:25 AM PST Jan 08, 2010 06:29:34 AM PST Duration : 9 sec        Failed
(267250)
    Jan 08, 2010 06:29:19 AM PST Jan 08, 2010 06:29:25 AM PST Duration : 5 sec 	      Error
 
    Jan 08, 2010 03:45:43 AM PST Jan 08, 2010 03:45:46 AM PST Duration : 3 sec 	      Error
    Jan 08, 2010 01:49:48 AM PST Jan 08, 2010 01:49:57 AM PST Duration : 8 sec 	      Failed
(267134)
    Jan 08, 2010 01:49:31 AM PST Jan 08, 2010 01:49:39 AM PST Duration : 7 sec        Error
    Jan 08, 2010 12:33:12 AM PST Jan 08, 2010 12:35:04 AM PST Duration : 1 min 51 sec Failed
(267099)
133 Jan 07, 2010 03:29:05 PM PST Jan 07, 2010 03:30:27 PM PST Duration : 1 min 21 sec Success
{code}

It looks like the reporting of failed runs is badly broken.
Two of the runs marked as Failed must actually have been Error, because the run-time is too
short.
No mails appear to have been sent for the runs marked as Error.

Furthermore, the Failed e-mails contain a "Build Number" that is irrelevant.

Another (minor) issue is that the times are reported in different formats: sometimes PST,
sometimes -0800.
It would be best if the -0800 was always used.

-- 
This message is automatically generated by JIRA.
-
If you think it was sent incorrectly contact one of the administrators: http://jira.codehaus.org/secure/Administrators.jspa
-
For more information on JIRA, see: http://www.atlassian.com/software/jira

        

Mime
View raw message