Yeah, that sounds good. I am planning on cutting an rc1 tomorrow then. 
Should the version be *-2.9.0-rc1? or just go with the regular 2.9.0, 
just not promote it (drop after tests). There are pros and cons for 
both. I am not sure what my preference would be. I assume users will not 
use this rc, it'll be just for more thorough testing, so it could be 
used from repository.a.o (without promoting) and then 2.9.0 would be ok, 
however it adds some confusion. 2.9.0-rc1 is definitely safer. I don't 
think we need a vote to release the rc1 either, or do we?

Ideas?
Hadrian

On 10/24/2011 08:36 AM, Claus Ibsen wrote:
> On Mon, Oct 24, 2011 at 2:33 PM, Hadrian Zbarcea<hzbarcea@gmail.com>  wrote:
>> I assume the proposal to do an RC first still stands, correct?
>>
>
> Yeah IMHO that could be a good idea. Also in light that there is 80+
> JIRA tickets assigned to 2.9.0.
> So we may be able to cut a RC sooner, and then have some JIRA tickets
> which we want to include in the GA release.
> And then after the RC we can work on those tickets.
>
>
>
>> Hadrian
>>
>> On 10/24/2011 08:26 AM, Christian Schneider wrote:
>>>
>>> Sounds good to me.
>>> I propose to aim for a release and vote in about a week.
>>>
>>> Christian
>>>
>>>
>>> Am 24.10.2011 13:55, schrieb Claus Ibsen:
>>>>
>>>> Hi
>>>>
>>>> Its almost 3 months since 2.8.0 was released
>>>> http://camel.apache.org/2011/07/25/camel-280-released.html
>>>>
>>>> I think we should start considering a Camel 2.9.0 release. And thus I
>>>> suggest to start focusing on bug fixes, and unit test fixes etc.
>>>> And to keep an eye on CI servers to fix test and other issues reported
>>>> there.
>>>>
>>>> Also I suggest to look at unresolved Camel 2.9.0 tickets in JIRA and
>>>> possible move tickets to 2.10 or 2.9.1 if that is possible.
>>>> Also if there is tickets which you think is a good/must have in 2.9.0
>>>> then I suggest to post here with the ticket numbers.
>>>> And of course to work on those tickets so they get resolved in the
>>>> near time.
>>>>
>>>> We have 84 open tickets which has been assigned to 2.9.0. I think
>>>> that's too much and encourage you to look at those
>>>> and either move/fix the tickets so we can get this down to a
>>>> management number of tickets to be resolved in the near time.
>>>>
>>>> Camel 2.9 open tickets:
>>>>
>>>> https://issues.apache.org/jira/secure/IssueNavigator.jspa?sorter/field=issuekey&sorter/order=DESC
>>>>
>>>>
>>>>
>>>>
>>>>
>>>
>>>
>>
>
>
>