ambari-dev mailing list archives

Site index · List index
Message view « Date » · « Thread »
Top « Date » · « Thread »
From "Antonenko Alexander (JIRA)" <j...@apache.org>
Subject [jira] [Updated] (AMBARI-15070) Graph scale behaviour is incorrect if time range is switched before graph data API call is complete
Date Wed, 17 Feb 2016 13:26:18 GMT

     [ https://issues.apache.org/jira/browse/AMBARI-15070?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
]

Antonenko Alexander updated AMBARI-15070:
-----------------------------------------
    Attachment: AMBARI-15070_222.patch

> Graph scale behaviour is incorrect if time range is switched before graph data API call
is complete
> ---------------------------------------------------------------------------------------------------
>
>                 Key: AMBARI-15070
>                 URL: https://issues.apache.org/jira/browse/AMBARI-15070
>             Project: Ambari
>          Issue Type: Bug
>          Components: ambari-web
>    Affects Versions: 2.2.2
>            Reporter: Antonenko Alexander
>            Assignee: Antonenko Alexander
>             Fix For: 2.2.2
>
>         Attachments: AMBARI-15070_222.patch, AMBARI-15070_trunk.patch
>
>
> *STR*
> # Switch metrics time range from 'Last 1 hour' to 'Last 1 year' (for example, on Dashboard;
data for 1 year should be available).
> # While metrics API call is pending, switch time range back to 1 hour (can be reproduced
if connection rate is low or server is highly loaded so that requests are being processed
slowly).
> *Result*
> After request with data for last year is complete, it's displayed on the graph, but the
scale is rendered with an accuracy to 1 hour which makes graph unusable 



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)

Mime
View raw message