Return-Path: X-Original-To: apmail-ambari-dev-archive@www.apache.org Delivered-To: apmail-ambari-dev-archive@www.apache.org Received: from mail.apache.org (hermes.apache.org [140.211.11.3]) by minotaur.apache.org (Postfix) with SMTP id 87EBC18E24 for ; Mon, 18 Jan 2016 22:23:40 +0000 (UTC) Received: (qmail 28385 invoked by uid 500); 18 Jan 2016 22:23:40 -0000 Delivered-To: apmail-ambari-dev-archive@ambari.apache.org Received: (qmail 28353 invoked by uid 500); 18 Jan 2016 22:23:40 -0000 Mailing-List: contact dev-help@ambari.apache.org; run by ezmlm Precedence: bulk List-Help: List-Unsubscribe: List-Post: List-Id: Reply-To: dev@ambari.apache.org Delivered-To: mailing list dev@ambari.apache.org Received: (qmail 28093 invoked by uid 99); 18 Jan 2016 22:23:40 -0000 Received: from arcas.apache.org (HELO arcas) (140.211.11.28) by apache.org (qpsmtpd/0.29) with ESMTP; Mon, 18 Jan 2016 22:23:40 +0000 Received: from arcas.apache.org (localhost [127.0.0.1]) by arcas (Postfix) with ESMTP id 1EE602C1F62 for ; Mon, 18 Jan 2016 22:23:40 +0000 (UTC) Date: Mon, 18 Jan 2016 22:23:40 +0000 (UTC) From: "Hudson (JIRA)" To: dev@ambari.apache.org Message-ID: In-Reply-To: References: Subject: [jira] [Commented] (AMBARI-14653) HBase Links Metric - more links pointing to the wrong hbase.master.info.port MIME-Version: 1.0 Content-Type: text/plain; charset=utf-8 Content-Transfer-Encoding: 7bit X-JIRA-FingerPrint: 30527f35849b9dde25b450d4833f0394 [ https://issues.apache.org/jira/browse/AMBARI-14653?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=15105892#comment-15105892 ] Hudson commented on AMBARI-14653: --------------------------------- FAILURE: Integrated in Ambari-trunk-Commit #4192 (See [https://builds.apache.org/job/Ambari-trunk-Commit/4192/]) AMBARI-14653. HBase Links Metric - more links pointing to the wrong (jaimin: [http://git-wip-us.apache.org/repos/asf?p=ambari.git&a=commit&h=21b6b31696718f5190a5b2cd52c469b097e00ffa]) * ambari-web/test/views/common/quick_link_view_test.js * ambari-web/app/views/common/quick_view_link_view.js > HBase Links Metric - more links pointing to the wrong hbase.master.info.port > ---------------------------------------------------------------------------- > > Key: AMBARI-14653 > URL: https://issues.apache.org/jira/browse/AMBARI-14653 > Project: Ambari > Issue Type: Bug > Components: ambari-web > Affects Versions: trunk > Reporter: Zhe (Joe) Wang > Assignee: Zhe (Joe) Wang > Priority: Critical > Fix For: trunk, 2.4.0 > > Attachments: AMBARI-14653.2.patch, AMBARI-14653.patch > > > HBase Links Metric - more links are pointing to the convetional hbase.master.info.port 60010, while it's configured as 16010. It happens when HBase links and Yarn links metrics are both on Dashboard. > It's due to in ambari/ambari-web/app/views/common/quick_view_link_view.js loadQuickLinksConfigSuccessCallback(), requiredSiteNames gets overridden every time when there is a quickLinks view loaded. So when Hbase links metric first gets loaded, it sets requiredSiteNames to ['core-site', 'hbase-site', 'hdfs-site']. But when Yarn links metric gets loaded, it overrides requiredSiteNames to ['core-site', 'hdfs-site', 'yarn-site']. > So when Yarn links get loaded, Hbase links get set to default value as 'hbase-site' is not in requiredSiteNames. -- This message was sent by Atlassian JIRA (v6.3.4#6332)