Return-Path: X-Original-To: apmail-ambari-dev-archive@www.apache.org Delivered-To: apmail-ambari-dev-archive@www.apache.org Received: from mail.apache.org (hermes.apache.org [140.211.11.3]) by minotaur.apache.org (Postfix) with SMTP id 52B6D18F4D for ; Tue, 29 Dec 2015 15:39:50 +0000 (UTC) Received: (qmail 58863 invoked by uid 500); 29 Dec 2015 15:39:49 -0000 Delivered-To: apmail-ambari-dev-archive@ambari.apache.org Received: (qmail 58828 invoked by uid 500); 29 Dec 2015 15:39:49 -0000 Mailing-List: contact dev-help@ambari.apache.org; run by ezmlm Precedence: bulk List-Help: List-Unsubscribe: List-Post: List-Id: Reply-To: dev@ambari.apache.org Delivered-To: mailing list dev@ambari.apache.org Received: (qmail 58796 invoked by uid 99); 29 Dec 2015 15:39:49 -0000 Received: from arcas.apache.org (HELO arcas) (140.211.11.28) by apache.org (qpsmtpd/0.29) with ESMTP; Tue, 29 Dec 2015 15:39:49 +0000 Received: from arcas.apache.org (localhost [127.0.0.1]) by arcas (Postfix) with ESMTP id A747C2C1F54 for ; Tue, 29 Dec 2015 15:39:49 +0000 (UTC) Date: Tue, 29 Dec 2015 15:39:49 +0000 (UTC) From: "Dmitry Lysnichenko (JIRA)" To: dev@ambari.apache.org Message-ID: In-Reply-To: References: Subject: [jira] [Updated] (AMBARI-14520) BE: Install packages call takes more than 3 minutes on 900 node cluster MIME-Version: 1.0 Content-Type: text/plain; charset=utf-8 Content-Transfer-Encoding: 7bit X-JIRA-FingerPrint: 30527f35849b9dde25b450d4833f0394 [ https://issues.apache.org/jira/browse/AMBARI-14520?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] Dmitry Lysnichenko updated AMBARI-14520: ---------------------------------------- Attachment: AMBARI-14520.patch > BE: Install packages call takes more than 3 minutes on 900 node cluster > ----------------------------------------------------------------------- > > Key: AMBARI-14520 > URL: https://issues.apache.org/jira/browse/AMBARI-14520 > Project: Ambari > Issue Type: Bug > Components: ambari-server > Reporter: Dmitry Lysnichenko > Assignee: Dmitry Lysnichenko > Attachments: AMBARI-14520.patch > > > On 900 host cluster the call to install packages took like 3 minutes 20 seconds which is kind of long. > {noformat} > POST http://perf-a-1:8080/api/v1/clusters/c1/stack_versions > {"ClusterStackVersions":{"stack":"HDP","version":"2.2","repository_version":"2.2.9.0-3393"}}: > {noformat} -- This message was sent by Atlassian JIRA (v6.3.4#6332)